The work flow of building inspection at training nurse hostel: Block E / Nur Farhanah Ma'zin
Practical training at the Jabatan Kerja Raya Muar Johor. The JKR Muar have a few department which is building department, road department, facilities department, quantities survey and administration. This company is function is to conduct the construction project, monitor the federal road and mainta...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2018
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/65574/1/65574.pdf https://ir.uitm.edu.my/id/eprint/65574/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.65574 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.655742022-09-08T03:16:13Z https://ir.uitm.edu.my/id/eprint/65574/ The work flow of building inspection at training nurse hostel: Block E / Nur Farhanah Ma'zin Ma'zin, Nur Farhanah TH Building construction Building inspection Building failures, errors, defects, etc. Practical training at the Jabatan Kerja Raya Muar Johor. The JKR Muar have a few department which is building department, road department, facilities department, quantities survey and administration. This company is function is to conduct the construction project, monitor the federal road and maintain the building. This also learn about the general inspection on the building that used by the building surveyor. On the inspection there are learn a few defect that on the building such as the crack on the wall, and concrete spalling. From this, its can identify the pattern, and possible causes of the defect. The case study area is located at Training Nurse Hostel (Block E), Sultanah Fatimah Specialist Hospital. The objective of the inspection on the building is to identify the causes of defect on building structural, to inspect and evaluate the defect on building structural, and the proposing the repair structure to be submitted by JKR Muar and JKR Johor. This learn about the flow chart for the building inspection on the Training Nurse Hostel (Block E). The inspection is involved the professional team such as Geotechnics Engineering Department, and Civil and Structure Engineering Department. Universiti Teknologi MARA, Perak 2018 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/65574/1/65574.pdf The work flow of building inspection at training nurse hostel: Block E / Nur Farhanah Ma'zin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. <http://terminalib.uitm.edu.my/65574.pdf> |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction Building inspection Building failures, errors, defects, etc. |
spellingShingle |
TH Building construction Building inspection Building failures, errors, defects, etc. Ma'zin, Nur Farhanah The work flow of building inspection at training nurse hostel: Block E / Nur Farhanah Ma'zin |
description |
Practical training at the Jabatan Kerja Raya Muar Johor. The JKR Muar have a few department which is building department, road department, facilities department, quantities survey and administration. This company is function is to conduct the construction project, monitor the federal road and maintain the building. This also learn about the general inspection on the building that used by the building surveyor. On the inspection there are learn a few defect that on the building such as the crack on the wall, and concrete spalling. From this, its can identify the pattern, and possible causes of the defect. The case study area is located at Training Nurse Hostel (Block E), Sultanah Fatimah Specialist Hospital. The objective of the inspection on the building is to identify the causes of defect on building structural, to inspect and evaluate the defect on building structural, and the proposing the repair structure to be submitted by JKR Muar and JKR Johor. This learn about the flow chart for the building inspection on the Training Nurse Hostel (Block E). The inspection is involved the professional team such as Geotechnics Engineering Department, and Civil and Structure Engineering Department. |
format |
Monograph |
author |
Ma'zin, Nur Farhanah |
author_facet |
Ma'zin, Nur Farhanah |
author_sort |
Ma'zin, Nur Farhanah |
title |
The work flow of building inspection at training nurse hostel: Block E / Nur Farhanah Ma'zin |
title_short |
The work flow of building inspection at training nurse hostel: Block E / Nur Farhanah Ma'zin |
title_full |
The work flow of building inspection at training nurse hostel: Block E / Nur Farhanah Ma'zin |
title_fullStr |
The work flow of building inspection at training nurse hostel: Block E / Nur Farhanah Ma'zin |
title_full_unstemmed |
The work flow of building inspection at training nurse hostel: Block E / Nur Farhanah Ma'zin |
title_sort |
work flow of building inspection at training nurse hostel: block e / nur farhanah ma'zin |
publisher |
Universiti Teknologi MARA, Perak |
publishDate |
2018 |
url |
https://ir.uitm.edu.my/id/eprint/65574/1/65574.pdf https://ir.uitm.edu.my/id/eprint/65574/ |
_version_ |
1744357239487987712 |
score |
13.211869 |