Wisma Naza Building Sungai Besi Kuala Lumpur / Muhammad Zulhilmi Mohd Yusof ... [et al.]
Alhamdulillah, lastly we are finished the task of Integrated Final Project. We are achieved the scope of work for this final project that we found out about the building which is about the detail of property, their maintenance management, maintenance policy and planning on that building, building de...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/64967/1/64967.pdf https://ir.uitm.edu.my/id/eprint/64967/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Alhamdulillah, lastly we are finished the task of Integrated Final Project. We are achieved the scope of work for this final project that we found out about the building which is about the detail of property, their maintenance management, maintenance policy and planning on that building, building design and technology design to relate with the maintenance work aspect, condition assessment of the building maintenance strategy, legal aspect of that building, and financial aspect for their maintenance work. This paper works presents the result of the studies performed in the Wisma Naza Properties at Jalan Sungai Besi Kuala Lumpur. It was about how the maintenance management on that building was ongoing. In the survey and inspection work, the interview is done by us and lead by Mr. Alshari bin Othman as technician on that building. We were taken to observe the current system and operation at the building. The result from the interview and survey works has been done at the Wisma Naza Properties, we found out they use a manual maintenance system .The conclusion is the maintenance management is important for give a comfort to the occupant and it also help to prolong the life cycle of the building. |
---|