Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid

Overall, this report is about deep foundation used at Infant Jesus Convent School to build new block of building consisting on 3 storey canteen and office. The foundation is in category of deep foundation because it use piling for the foundation. The space provided by the school is not wide enough t...

Full description

Saved in:
Bibliographic Details
Main Author: Majid, Mohamad Nur Arif
Format: Student Project
Language:English
Published: 2013
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/63839/1/63839.pdf
https://ir.uitm.edu.my/id/eprint/63839/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.63839
record_format eprints
spelling my.uitm.ir.638392022-08-18T04:23:20Z https://ir.uitm.edu.my/id/eprint/63839/ Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid Majid, Mohamad Nur Arif TH Building construction Buildings: Construction with reference to use.Including public buildings, dwellings Building fittings and their installation Overall, this report is about deep foundation used at Infant Jesus Convent School to build new block of building consisting on 3 storey canteen and office. The foundation is in category of deep foundation because it use piling for the foundation. The space provided by the school is not wide enough to support three storey building at the site. The project was started from early of January this year (2013) and being targeted to finish the piling works by the end of 2013. Infant Jesus Convent School was placed at the middle of city. And the site provided was located between school buildings. Hydraulic Piling is chosen for the method of piling. Even though this method is high in cost, but the method is not produce noise pollution. The method takes more time than the other piling method, but it works efficiently and environment-friendly. 2013 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/63839/1/63839.pdf Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid. (2013) [Student Project] <http://terminalib.uitm.edu.my/63839.pdf>
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Buildings: Construction with reference to use.Including public buildings, dwellings
Building fittings and their installation
spellingShingle TH Building construction
Buildings: Construction with reference to use.Including public buildings, dwellings
Building fittings and their installation
Majid, Mohamad Nur Arif
Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid
description Overall, this report is about deep foundation used at Infant Jesus Convent School to build new block of building consisting on 3 storey canteen and office. The foundation is in category of deep foundation because it use piling for the foundation. The space provided by the school is not wide enough to support three storey building at the site. The project was started from early of January this year (2013) and being targeted to finish the piling works by the end of 2013. Infant Jesus Convent School was placed at the middle of city. And the site provided was located between school buildings. Hydraulic Piling is chosen for the method of piling. Even though this method is high in cost, but the method is not produce noise pollution. The method takes more time than the other piling method, but it works efficiently and environment-friendly.
format Student Project
author Majid, Mohamad Nur Arif
author_facet Majid, Mohamad Nur Arif
author_sort Majid, Mohamad Nur Arif
title Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid
title_short Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid
title_full Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid
title_fullStr Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid
title_full_unstemmed Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid
title_sort construction works for piling system at infant jesus convent school / mohamad nur arif majid
publishDate 2013
url https://ir.uitm.edu.my/id/eprint/63839/1/63839.pdf
https://ir.uitm.edu.my/id/eprint/63839/
_version_ 1743110415437529088
score 13.211869