The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah
Generally, this practical training report clarifies the information about all of the works, processes and methods on the inspection of the structure and formwork for Projek MASS RAPID TRANSIT Lembah Kelang Jajaran Sungai Buloh-Kajang (SUNGAI BULOH STATION SHARED CONCOURSE LEVEL) .This practical tra...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/61718/1/61718.pdf https://ir.uitm.edu.my/id/eprint/61718/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.61718 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.617182022-06-20T08:56:17Z https://ir.uitm.edu.my/id/eprint/61718/ The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah Tuan Hamzah, Tuan Mohamad Hakimi TH Building construction Building inspection Generally, this practical training report clarifies the information about all of the works, processes and methods on the inspection of the structure and formwork for Projek MASS RAPID TRANSIT Lembah Kelang Jajaran Sungai Buloh-Kajang (SUNGAI BULOH STATION SHARED CONCOURSE LEVEL) .This practical training report is prepared based site visit at the construction site. This practical training report is started with explanation and clarification of company background and background of project. The inspection of formwork and structure isn’t as easy as it seen. This inspection need to focus when inspection because if any collapse after the construction, our company will fully responsible to the failure. The inspection must follow the drawing that have been design and all the specification and what have been include in the drawing must be follow to avoid from the failure after the construction. As the conclusion, this practical training report can explain in details about the inspection of formwork to all of the readers. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/61718/1/61718.pdf The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah. (2015) [Student Project] |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction Building inspection |
spellingShingle |
TH Building construction Building inspection Tuan Hamzah, Tuan Mohamad Hakimi The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah |
description |
Generally, this practical training report clarifies the information about all of the works, processes and methods on the inspection of the structure and formwork for Projek MASS RAPID TRANSIT Lembah Kelang Jajaran Sungai Buloh-Kajang (SUNGAI BULOH STATION SHARED CONCOURSE LEVEL) .This practical
training report is prepared based site visit at the construction site. This practical training report is started with explanation and clarification of company background and background of project. The inspection of formwork and structure isn’t as easy as it seen. This inspection need to focus when inspection because if any collapse after the construction, our company will fully responsible to the failure. The inspection must follow the drawing that have been design and all the
specification and what have been include in the drawing must be follow to avoid from the failure after the construction. As the conclusion, this practical training
report can explain in details about the inspection of formwork to all of the readers. |
format |
Student Project |
author |
Tuan Hamzah, Tuan Mohamad Hakimi |
author_facet |
Tuan Hamzah, Tuan Mohamad Hakimi |
author_sort |
Tuan Hamzah, Tuan Mohamad Hakimi |
title |
The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah |
title_short |
The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah |
title_full |
The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah |
title_fullStr |
The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah |
title_full_unstemmed |
The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah |
title_sort |
inspection on project lembah kelang mass rapid transit line of sungai buloh-kajang (sungai buloh station concourse level) / tuan mohamad hakimi tuan hamzah |
publishDate |
2015 |
url |
https://ir.uitm.edu.my/id/eprint/61718/1/61718.pdf https://ir.uitm.edu.my/id/eprint/61718/ |
_version_ |
1736837359987589120 |
score |
13.211869 |