The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah

Generally, this practical training report clarifies the information about all of the works, processes and methods on the inspection of the structure and formwork for Projek MASS RAPID TRANSIT Lembah Kelang Jajaran Sungai Buloh-Kajang (SUNGAI BULOH STATION SHARED CONCOURSE LEVEL) .This practical tra...

Full description

Saved in:
Bibliographic Details
Main Author: Tuan Hamzah, Tuan Mohamad Hakimi
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/61718/1/61718.pdf
https://ir.uitm.edu.my/id/eprint/61718/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.61718
record_format eprints
spelling my.uitm.ir.617182022-06-20T08:56:17Z https://ir.uitm.edu.my/id/eprint/61718/ The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah Tuan Hamzah, Tuan Mohamad Hakimi TH Building construction Building inspection Generally, this practical training report clarifies the information about all of the works, processes and methods on the inspection of the structure and formwork for Projek MASS RAPID TRANSIT Lembah Kelang Jajaran Sungai Buloh-Kajang (SUNGAI BULOH STATION SHARED CONCOURSE LEVEL) .This practical training report is prepared based site visit at the construction site. This practical training report is started with explanation and clarification of company background and background of project. The inspection of formwork and structure isn’t as easy as it seen. This inspection need to focus when inspection because if any collapse after the construction, our company will fully responsible to the failure. The inspection must follow the drawing that have been design and all the specification and what have been include in the drawing must be follow to avoid from the failure after the construction. As the conclusion, this practical training report can explain in details about the inspection of formwork to all of the readers. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/61718/1/61718.pdf The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah. (2015) [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Building inspection
spellingShingle TH Building construction
Building inspection
Tuan Hamzah, Tuan Mohamad Hakimi
The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah
description Generally, this practical training report clarifies the information about all of the works, processes and methods on the inspection of the structure and formwork for Projek MASS RAPID TRANSIT Lembah Kelang Jajaran Sungai Buloh-Kajang (SUNGAI BULOH STATION SHARED CONCOURSE LEVEL) .This practical training report is prepared based site visit at the construction site. This practical training report is started with explanation and clarification of company background and background of project. The inspection of formwork and structure isn’t as easy as it seen. This inspection need to focus when inspection because if any collapse after the construction, our company will fully responsible to the failure. The inspection must follow the drawing that have been design and all the specification and what have been include in the drawing must be follow to avoid from the failure after the construction. As the conclusion, this practical training report can explain in details about the inspection of formwork to all of the readers.
format Student Project
author Tuan Hamzah, Tuan Mohamad Hakimi
author_facet Tuan Hamzah, Tuan Mohamad Hakimi
author_sort Tuan Hamzah, Tuan Mohamad Hakimi
title The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah
title_short The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah
title_full The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah
title_fullStr The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah
title_full_unstemmed The inspection on project Lembah Kelang Mass Rapid transit line of Sungai Buloh-Kajang (Sungai Buloh Station Concourse Level) / Tuan Mohamad Hakimi Tuan Hamzah
title_sort inspection on project lembah kelang mass rapid transit line of sungai buloh-kajang (sungai buloh station concourse level) / tuan mohamad hakimi tuan hamzah
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/61718/1/61718.pdf
https://ir.uitm.edu.my/id/eprint/61718/
_version_ 1736837359987589120
score 13.211869