The significance documentations in: cadangan membina sebuah pangsapuri 41 tingkat (338 unit) (West Side ii) dan kemudahan penduduk serta 6 paras podium tempat letak kereta, sky bridge dan 1 unit pondok pengawal di atas Lot 25951, Jalan Residen Utama, Desa Parkcity, Mukim Batu, Wilayah Persekutuan Kuala Lumpur / Amirulhakim Puat
This report explained about the most important documentation in a construction. This report made based on 4 months experience in the construction site. This report is divided into few chapters including company’s background, organization chart and project’s background. The objectives for this case s...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/61655/1/61655.pdf https://ir.uitm.edu.my/id/eprint/61655/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.61655 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.616552022-06-20T08:34:33Z https://ir.uitm.edu.my/id/eprint/61655/ The significance documentations in: cadangan membina sebuah pangsapuri 41 tingkat (338 unit) (West Side ii) dan kemudahan penduduk serta 6 paras podium tempat letak kereta, sky bridge dan 1 unit pondok pengawal di atas Lot 25951, Jalan Residen Utama, Desa Parkcity, Mukim Batu, Wilayah Persekutuan Kuala Lumpur / Amirulhakim Puat Puat, Amirulhakim TH Building construction House construction This report explained about the most important documentation in a construction. This report made based on 4 months experience in the construction site. This report is divided into few chapters including company’s background, organization chart and project’s background. The objectives for this case study are to identify the types of documentation are used in the construction and the difference of documentations. Methods of study that have been used during this case study are interview with different views of people, by referring method statements and drawings, by surfing internet and site visit. In this report, it will explain all about the documentation in a construction and it will explain why the documentations is so importance. After that, The role of complete and accurate documentation procedures is important in the construction industry as a means of reducing risk. Thorough documentation can be critical when mounting a legal defense against construction defect claims/lawsuits and may limit the extent of liability in the event that a judgment is awarded.In the event of legal action, evidence of the exact circumstances surrounding a dispute as well as conversations that took place may be required. It is advisable to keep concise notes regarding any dispute so that a written record can be drawn upon if needed. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/61655/1/61655.pdf The significance documentations in: cadangan membina sebuah pangsapuri 41 tingkat (338 unit) (West Side ii) dan kemudahan penduduk serta 6 paras podium tempat letak kereta, sky bridge dan 1 unit pondok pengawal di atas Lot 25951, Jalan Residen Utama, Desa Parkcity, Mukim Batu, Wilayah Persekutuan Kuala Lumpur / Amirulhakim Puat. (2015) [Student Project] |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction House construction |
spellingShingle |
TH Building construction House construction Puat, Amirulhakim The significance documentations in: cadangan membina sebuah pangsapuri 41 tingkat (338 unit) (West Side ii) dan kemudahan penduduk serta 6 paras podium tempat letak kereta, sky bridge dan 1 unit pondok pengawal di atas Lot 25951, Jalan Residen Utama, Desa Parkcity, Mukim Batu, Wilayah Persekutuan Kuala Lumpur / Amirulhakim Puat |
description |
This report explained about the most important documentation in a construction. This report made based on 4 months experience in the construction site. This report is divided into few chapters including company’s background, organization chart and project’s background. The objectives for this case study are to identify the types of documentation are used in the construction and the difference of documentations. Methods of study that have been used during this case study are interview with different views of people, by referring method statements and drawings, by surfing internet and site visit. In this report, it will explain all about the documentation in a construction and it will explain why the documentations is so importance. After that, The role of complete and accurate documentation procedures is important in the construction industry as a means of reducing risk. Thorough documentation can be critical when mounting a legal defense against construction defect claims/lawsuits and may limit the extent of liability in the event that a judgment is awarded.In the event of legal action, evidence of the exact circumstances surrounding a dispute as well as conversations that took place may be required. It is advisable to keep concise notes regarding any dispute so that a written record can be drawn upon if needed. |
format |
Student Project |
author |
Puat, Amirulhakim |
author_facet |
Puat, Amirulhakim |
author_sort |
Puat, Amirulhakim |
title |
The significance documentations in: cadangan membina sebuah pangsapuri 41 tingkat (338 unit) (West Side ii) dan kemudahan penduduk serta 6 paras podium tempat letak kereta, sky bridge dan 1 unit pondok pengawal di atas Lot 25951, Jalan Residen Utama, Desa Parkcity, Mukim Batu, Wilayah Persekutuan Kuala Lumpur / Amirulhakim Puat |
title_short |
The significance documentations in: cadangan membina sebuah pangsapuri 41 tingkat (338 unit) (West Side ii) dan kemudahan penduduk serta 6 paras podium tempat letak kereta, sky bridge dan 1 unit pondok pengawal di atas Lot 25951, Jalan Residen Utama, Desa Parkcity, Mukim Batu, Wilayah Persekutuan Kuala Lumpur / Amirulhakim Puat |
title_full |
The significance documentations in: cadangan membina sebuah pangsapuri 41 tingkat (338 unit) (West Side ii) dan kemudahan penduduk serta 6 paras podium tempat letak kereta, sky bridge dan 1 unit pondok pengawal di atas Lot 25951, Jalan Residen Utama, Desa Parkcity, Mukim Batu, Wilayah Persekutuan Kuala Lumpur / Amirulhakim Puat |
title_fullStr |
The significance documentations in: cadangan membina sebuah pangsapuri 41 tingkat (338 unit) (West Side ii) dan kemudahan penduduk serta 6 paras podium tempat letak kereta, sky bridge dan 1 unit pondok pengawal di atas Lot 25951, Jalan Residen Utama, Desa Parkcity, Mukim Batu, Wilayah Persekutuan Kuala Lumpur / Amirulhakim Puat |
title_full_unstemmed |
The significance documentations in: cadangan membina sebuah pangsapuri 41 tingkat (338 unit) (West Side ii) dan kemudahan penduduk serta 6 paras podium tempat letak kereta, sky bridge dan 1 unit pondok pengawal di atas Lot 25951, Jalan Residen Utama, Desa Parkcity, Mukim Batu, Wilayah Persekutuan Kuala Lumpur / Amirulhakim Puat |
title_sort |
significance documentations in: cadangan membina sebuah pangsapuri 41 tingkat (338 unit) (west side ii) dan kemudahan penduduk serta 6 paras podium tempat letak kereta, sky bridge dan 1 unit pondok pengawal di atas lot 25951, jalan residen utama, desa parkcity, mukim batu, wilayah persekutuan kuala lumpur / amirulhakim puat |
publishDate |
2015 |
url |
https://ir.uitm.edu.my/id/eprint/61655/1/61655.pdf https://ir.uitm.edu.my/id/eprint/61655/ |
_version_ |
1736837355372806144 |
score |
13.211869 |