Mitsubishi Electric / Muhammad Nazran Naza’in

This case study assignment is about analyzing the chosen product. The company that has been chosen by me is Mitsubishi Electrical. From the various choice of products they provided, I have chosen the Water Pump technology. In this case study, I manage to finish the SWOT analysis about the product th...

Full description

Saved in:
Bibliographic Details
Main Author: Naza’in, Muhammad Nazran
Format: Entrepreneurship Project
Language:English
Published: 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/61598/1/61598.pdf
https://ir.uitm.edu.my/id/eprint/61598/
Tags: Add Tag
No Tags, Be the first to tag this record!