Finishing work for mosque building / Muhamad Fikry Mohd Noor
This report, described about the types and materials that use on wall, floor, staircase and roof finishes on site of “Cadangan membina dan menyiapkan sebuah bangunan masjid 2 tingkat jenis lantai gantung dan lain-lain kerja yang berkaitan di Masjid Jamek Kampung Tui, Muar, Johor. This report was rep...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/61455/1/61455.pdf https://ir.uitm.edu.my/id/eprint/61455/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This report, described about the types and materials that use on wall, floor, staircase and roof finishes on site of “Cadangan membina dan menyiapkan sebuah bangunan masjid 2 tingkat jenis lantai gantung dan lain-lain kerja yang berkaitan di Masjid Jamek Kampung Tui, Muar, Johor. This report was reported based on the observation and experience of four months at the construction project. This report is divided into several parts with beginning with an introduction, organizational background, case study, problem and recommendation, and conclusion. From the observation, the installation and operation process of finishes were very complex. This report explain how to install the wall, floor, staircase and roof finishes at site project very detail step by step. Then, this report delivered some suggestions to solve the problem. In conclusion, this report explained and described about the types and materials of wall, floor, staircase and roof finishes at site project that involve in this report. |
---|