Improvement of medium and large press line through line balancing / Nor Haryani Nor Shahid

Autokeen Sdn Bhd (AKSB) is a company that produced automotive parts for major car manufacturers in Malaysia. However, the current production is behind the production plan. Based on initial observations, the problems occurred were due to inaccurate cycle time and poor Standard Operating Procedure (SO...

Full description

Saved in:
Bibliographic Details
Main Author: Nor Shahid, Nor Haryani
Format: Student Project
Language:English
Published: 2016
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/61141/1/61141.pdf
https://ir.uitm.edu.my/id/eprint/61141/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.61141
record_format eprints
spelling my.uitm.ir.611412022-07-19T06:09:20Z https://ir.uitm.edu.my/id/eprint/61141/ Improvement of medium and large press line through line balancing / Nor Haryani Nor Shahid Nor Shahid, Nor Haryani Just-in-time systems Manufacturing processes. Lean manufacturing Autokeen Sdn Bhd (AKSB) is a company that produced automotive parts for major car manufacturers in Malaysia. However, the current production is behind the production plan. Based on initial observations, the problems occurred were due to inaccurate cycle time and poor Standard Operating Procedure (SOP). To overcome these problems, improvement of cycle time at large and medium press line is intended. Based on the production volume for these press lines, Pareto chart has been applied to highlight the most critical and fast moving parts for further improvement. Time study and standardized work combination table have been used as tools to measure and to improve the cycle time. More efficient and effective SOP have been established. Thus, the productivity has been improved by reducing wastes such as unnecessary movement, WIP and waiting time. 2016-07 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/61141/1/61141.pdf Improvement of medium and large press line through line balancing / Nor Haryani Nor Shahid. (2016) [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Just-in-time systems
Manufacturing processes. Lean manufacturing
spellingShingle Just-in-time systems
Manufacturing processes. Lean manufacturing
Nor Shahid, Nor Haryani
Improvement of medium and large press line through line balancing / Nor Haryani Nor Shahid
description Autokeen Sdn Bhd (AKSB) is a company that produced automotive parts for major car manufacturers in Malaysia. However, the current production is behind the production plan. Based on initial observations, the problems occurred were due to inaccurate cycle time and poor Standard Operating Procedure (SOP). To overcome these problems, improvement of cycle time at large and medium press line is intended. Based on the production volume for these press lines, Pareto chart has been applied to highlight the most critical and fast moving parts for further improvement. Time study and standardized work combination table have been used as tools to measure and to improve the cycle time. More efficient and effective SOP have been established. Thus, the productivity has been improved by reducing wastes such as unnecessary movement, WIP and waiting time.
format Student Project
author Nor Shahid, Nor Haryani
author_facet Nor Shahid, Nor Haryani
author_sort Nor Shahid, Nor Haryani
title Improvement of medium and large press line through line balancing / Nor Haryani Nor Shahid
title_short Improvement of medium and large press line through line balancing / Nor Haryani Nor Shahid
title_full Improvement of medium and large press line through line balancing / Nor Haryani Nor Shahid
title_fullStr Improvement of medium and large press line through line balancing / Nor Haryani Nor Shahid
title_full_unstemmed Improvement of medium and large press line through line balancing / Nor Haryani Nor Shahid
title_sort improvement of medium and large press line through line balancing / nor haryani nor shahid
publishDate 2016
url https://ir.uitm.edu.my/id/eprint/61141/1/61141.pdf
https://ir.uitm.edu.my/id/eprint/61141/
_version_ 1739834072910266368
score 13.211869