The implementation of reclamation on paddy field as preparation for Sekolah Menengah Kebangsaan Agama Jerlun, Padang Sera Kodiang Kedah Darul Aman / Muhammad Shukur Omar

Earthwork is one of important stage in construction . All the process from the site clearing and the final stage of earthwork must follow the specification from Jabatan Kerja Raya . Any non corfomance product that given by contractor will be noticed by JKR . The site of Sekolah Menengah Kebangsaan A...

Full description

Saved in:
Bibliographic Details
Main Author: Omar, Muhammad Shukur
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/60867/1/60867.pdf
https://ir.uitm.edu.my/id/eprint/60867/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.60867
record_format eprints
spelling my.uitm.ir.608672022-06-02T08:00:09Z https://ir.uitm.edu.my/id/eprint/60867/ The implementation of reclamation on paddy field as preparation for Sekolah Menengah Kebangsaan Agama Jerlun, Padang Sera Kodiang Kedah Darul Aman / Muhammad Shukur Omar Omar, Muhammad Shukur Water distribution systems TH Building construction Earthwork is one of important stage in construction . All the process from the site clearing and the final stage of earthwork must follow the specification from Jabatan Kerja Raya . Any non corfomance product that given by contractor will be noticed by JKR . The site of Sekolah Menengah Kebangsaan Agama Jerlun is the site of former paddy field and it contain of unsuitable soil material . So the contractor must remove all the unsuitable soil material to another dump . The soil imported from the quary also must be approval by JKR . The types and characteristics also must suitable . Before the imported filling transport to our site , the contractor must get the permission from local authority which is Pejabat Tanah Daerah . The approval from Pejabat Tanah Daerah will proceed our back fill work and the imported soil can be transport . All the machineries and lorry must work well so that our work can run smoothly .The safety on site also must be focus. Toolbox meeting which is conduct by site safety supervisor must be attend by all the labour . 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/60867/1/60867.pdf The implementation of reclamation on paddy field as preparation for Sekolah Menengah Kebangsaan Agama Jerlun, Padang Sera Kodiang Kedah Darul Aman / Muhammad Shukur Omar. (2015) [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Water distribution systems
TH Building construction
spellingShingle Water distribution systems
TH Building construction
Omar, Muhammad Shukur
The implementation of reclamation on paddy field as preparation for Sekolah Menengah Kebangsaan Agama Jerlun, Padang Sera Kodiang Kedah Darul Aman / Muhammad Shukur Omar
description Earthwork is one of important stage in construction . All the process from the site clearing and the final stage of earthwork must follow the specification from Jabatan Kerja Raya . Any non corfomance product that given by contractor will be noticed by JKR . The site of Sekolah Menengah Kebangsaan Agama Jerlun is the site of former paddy field and it contain of unsuitable soil material . So the contractor must remove all the unsuitable soil material to another dump . The soil imported from the quary also must be approval by JKR . The types and characteristics also must suitable . Before the imported filling transport to our site , the contractor must get the permission from local authority which is Pejabat Tanah Daerah . The approval from Pejabat Tanah Daerah will proceed our back fill work and the imported soil can be transport . All the machineries and lorry must work well so that our work can run smoothly .The safety on site also must be focus. Toolbox meeting which is conduct by site safety supervisor must be attend by all the labour .
format Student Project
author Omar, Muhammad Shukur
author_facet Omar, Muhammad Shukur
author_sort Omar, Muhammad Shukur
title The implementation of reclamation on paddy field as preparation for Sekolah Menengah Kebangsaan Agama Jerlun, Padang Sera Kodiang Kedah Darul Aman / Muhammad Shukur Omar
title_short The implementation of reclamation on paddy field as preparation for Sekolah Menengah Kebangsaan Agama Jerlun, Padang Sera Kodiang Kedah Darul Aman / Muhammad Shukur Omar
title_full The implementation of reclamation on paddy field as preparation for Sekolah Menengah Kebangsaan Agama Jerlun, Padang Sera Kodiang Kedah Darul Aman / Muhammad Shukur Omar
title_fullStr The implementation of reclamation on paddy field as preparation for Sekolah Menengah Kebangsaan Agama Jerlun, Padang Sera Kodiang Kedah Darul Aman / Muhammad Shukur Omar
title_full_unstemmed The implementation of reclamation on paddy field as preparation for Sekolah Menengah Kebangsaan Agama Jerlun, Padang Sera Kodiang Kedah Darul Aman / Muhammad Shukur Omar
title_sort implementation of reclamation on paddy field as preparation for sekolah menengah kebangsaan agama jerlun, padang sera kodiang kedah darul aman / muhammad shukur omar
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/60867/1/60867.pdf
https://ir.uitm.edu.my/id/eprint/60867/
_version_ 1735389662152753152
score 13.211869