Laman Perbadanan Kemajuan Negeri Selangor, Shah Alam / Ahmad Hassanuddin Md Ishak, Nur Naeliya Tamyes dan Nurin Nabilla Ramlan

Integrated Final Project (IFP) is the most important report that should be prepared by the final year Student of AP 119 Program. The report of the final project require the group member to study and analyze the maintenance organization and management at their selected case study. The group shall the...

Full description

Saved in:
Bibliographic Details
Main Authors: Md Ishak, Ahmad Hassanuddin, Tamyes, Nur Naeliya, Ramlan, Nurin Nabilla
Format: Student Project
Language:English
Published: 2018
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/60852/1/60852.pdf
https://ir.uitm.edu.my/id/eprint/60852/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.60852
record_format eprints
spelling my.uitm.ir.608522022-06-02T07:47:04Z https://ir.uitm.edu.my/id/eprint/60852/ Laman Perbadanan Kemajuan Negeri Selangor, Shah Alam / Ahmad Hassanuddin Md Ishak, Nur Naeliya Tamyes dan Nurin Nabilla Ramlan Md Ishak, Ahmad Hassanuddin Tamyes, Nur Naeliya Ramlan, Nurin Nabilla TH Building construction Management of the construction site. Superintendence of building construction Integrated Final Project (IFP) is the most important report that should be prepared by the final year Student of AP 119 Program. The report of the final project require the group member to study and analyze the maintenance organization and management at their selected case study. The group shall then relate the collected data with their knowledge in how to build a well maintenance organization. At the end of this study, the students shall be able to identify the strength and weakness of the organization that emphasis to the property maintenance management. The objectives of the Integrated Final Project (IFP) are generally to deliver the comprehensive understanding on the importance of the property maintenance management. Besides, it also require the student to learn and analyze through the collected data of the multi-disciplinary approach in maintenance. In addition, the Integrated Final Project also require the students to be able to prepare a scientific technical report of the maintenance at their selected case study. Lastly, it also require the students to be able to communicate, work in team, cooperate and confidently present the report to the panel. For our group, the selected case study for the Integrated Final Project is the Laman Perbadanan Kemajuan Negeri Selangor (PKNS) which are located at Seksyen 14 Shah Alam. The method that has been implement by our group to gain the building information are generally through 3 basic phase. The first phase is by select the case study, then provide the Official Letter from UiTM to prove the student identification and also the cover letter from the student which to inform the intention and make the proper appointment with building owner through phone call and email. When we has gain the approval, the second phase is by doing the site visit, gather all the needed data and information and make the data and information analysis. The last phase is by preparing and completing the report by following the guidance provided. At the third phase, our group will have to go through the critique session with the subject supervisor, who responsible to supervise the report to ensure that we are on the right track and with the right format while accomplishing the report. The Integrated Final Project report is then will be submitted to the Program Coordinator for final submission and the student will do the presentation of their report in front of the panel. 2018 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/60852/1/60852.pdf Laman Perbadanan Kemajuan Negeri Selangor, Shah Alam / Ahmad Hassanuddin Md Ishak, Nur Naeliya Tamyes dan Nurin Nabilla Ramlan. (2018) [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Management of the construction site. Superintendence of building construction
spellingShingle TH Building construction
Management of the construction site. Superintendence of building construction
Md Ishak, Ahmad Hassanuddin
Tamyes, Nur Naeliya
Ramlan, Nurin Nabilla
Laman Perbadanan Kemajuan Negeri Selangor, Shah Alam / Ahmad Hassanuddin Md Ishak, Nur Naeliya Tamyes dan Nurin Nabilla Ramlan
description Integrated Final Project (IFP) is the most important report that should be prepared by the final year Student of AP 119 Program. The report of the final project require the group member to study and analyze the maintenance organization and management at their selected case study. The group shall then relate the collected data with their knowledge in how to build a well maintenance organization. At the end of this study, the students shall be able to identify the strength and weakness of the organization that emphasis to the property maintenance management. The objectives of the Integrated Final Project (IFP) are generally to deliver the comprehensive understanding on the importance of the property maintenance management. Besides, it also require the student to learn and analyze through the collected data of the multi-disciplinary approach in maintenance. In addition, the Integrated Final Project also require the students to be able to prepare a scientific technical report of the maintenance at their selected case study. Lastly, it also require the students to be able to communicate, work in team, cooperate and confidently present the report to the panel. For our group, the selected case study for the Integrated Final Project is the Laman Perbadanan Kemajuan Negeri Selangor (PKNS) which are located at Seksyen 14 Shah Alam. The method that has been implement by our group to gain the building information are generally through 3 basic phase. The first phase is by select the case study, then provide the Official Letter from UiTM to prove the student identification and also the cover letter from the student which to inform the intention and make the proper appointment with building owner through phone call and email. When we has gain the approval, the second phase is by doing the site visit, gather all the needed data and information and make the data and information analysis. The last phase is by preparing and completing the report by following the guidance provided. At the third phase, our group will have to go through the critique session with the subject supervisor, who responsible to supervise the report to ensure that we are on the right track and with the right format while accomplishing the report. The Integrated Final Project report is then will be submitted to the Program Coordinator for final submission and the student will do the presentation of their report in front of the panel.
format Student Project
author Md Ishak, Ahmad Hassanuddin
Tamyes, Nur Naeliya
Ramlan, Nurin Nabilla
author_facet Md Ishak, Ahmad Hassanuddin
Tamyes, Nur Naeliya
Ramlan, Nurin Nabilla
author_sort Md Ishak, Ahmad Hassanuddin
title Laman Perbadanan Kemajuan Negeri Selangor, Shah Alam / Ahmad Hassanuddin Md Ishak, Nur Naeliya Tamyes dan Nurin Nabilla Ramlan
title_short Laman Perbadanan Kemajuan Negeri Selangor, Shah Alam / Ahmad Hassanuddin Md Ishak, Nur Naeliya Tamyes dan Nurin Nabilla Ramlan
title_full Laman Perbadanan Kemajuan Negeri Selangor, Shah Alam / Ahmad Hassanuddin Md Ishak, Nur Naeliya Tamyes dan Nurin Nabilla Ramlan
title_fullStr Laman Perbadanan Kemajuan Negeri Selangor, Shah Alam / Ahmad Hassanuddin Md Ishak, Nur Naeliya Tamyes dan Nurin Nabilla Ramlan
title_full_unstemmed Laman Perbadanan Kemajuan Negeri Selangor, Shah Alam / Ahmad Hassanuddin Md Ishak, Nur Naeliya Tamyes dan Nurin Nabilla Ramlan
title_sort laman perbadanan kemajuan negeri selangor, shah alam / ahmad hassanuddin md ishak, nur naeliya tamyes dan nurin nabilla ramlan
publishDate 2018
url https://ir.uitm.edu.my/id/eprint/60852/1/60852.pdf
https://ir.uitm.edu.my/id/eprint/60852/
_version_ 1735389661389389824
score 13.211869