The process of piling work using drop hammer method / Muhamad Fahmi Hussin

Industrial training is a key component of the learning curriculum University Technology Mara (UiTM). Students are required to pass the industrial training prior to the award certified in a particular organization for one semester to expose them to the working environment. The training also embed mo...

Full description

Saved in:
Bibliographic Details
Main Author: Hussin, Muhamad Fahmi
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/60185/1/60185.pdf
https://ir.uitm.edu.my/id/eprint/60185/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.60185
record_format eprints
spelling my.uitm.ir.601852022-05-24T08:50:05Z https://ir.uitm.edu.my/id/eprint/60185/ The process of piling work using drop hammer method / Muhamad Fahmi Hussin Hussin, Muhamad Fahmi Foundations Piles and pile-driving TH Building construction Industrial training is a key component of the learning curriculum University Technology Mara (UiTM). Students are required to pass the industrial training prior to the award certified in a particular organization for one semester to expose them to the working environment. The training also embed moral qualities in themselves as a student of the nature of trust and responsibility in carrying out the duties and confident in making a decision. The industrial training, the students are faced with many challenges and problems that need to be identified. Therefore, preparation, both mentally and physically to undertake and complete the task. In addition, training is also required to be carried out for all students in last semester in Diploma of Building Survey at the end of the year 2015. This training run for 4 months from 1 Dicember 2014 until 1 April 2015. I have applied for industrial training at Gerbang Nusajaya Sdn Bhd. Here, I was placed on the site construction where this company build a new building. During this training, I was given the opportunity to follow the engineer and site supervisor to see the environment on site and others. During industrial training, I was given for 8 half hours a day, from 8.00am right up 5.30pm daily from Monday to Friday and half day on Saturday from 8.00am right up 1.00pm. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/60185/1/60185.pdf (2015) The process of piling work using drop hammer method / Muhamad Fahmi Hussin. [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Foundations
Piles and pile-driving
TH Building construction
spellingShingle Foundations
Piles and pile-driving
TH Building construction
Hussin, Muhamad Fahmi
The process of piling work using drop hammer method / Muhamad Fahmi Hussin
description Industrial training is a key component of the learning curriculum University Technology Mara (UiTM). Students are required to pass the industrial training prior to the award certified in a particular organization for one semester to expose them to the working environment. The training also embed moral qualities in themselves as a student of the nature of trust and responsibility in carrying out the duties and confident in making a decision. The industrial training, the students are faced with many challenges and problems that need to be identified. Therefore, preparation, both mentally and physically to undertake and complete the task. In addition, training is also required to be carried out for all students in last semester in Diploma of Building Survey at the end of the year 2015. This training run for 4 months from 1 Dicember 2014 until 1 April 2015. I have applied for industrial training at Gerbang Nusajaya Sdn Bhd. Here, I was placed on the site construction where this company build a new building. During this training, I was given the opportunity to follow the engineer and site supervisor to see the environment on site and others. During industrial training, I was given for 8 half hours a day, from 8.00am right up 5.30pm daily from Monday to Friday and half day on Saturday from 8.00am right up 1.00pm.
format Student Project
author Hussin, Muhamad Fahmi
author_facet Hussin, Muhamad Fahmi
author_sort Hussin, Muhamad Fahmi
title The process of piling work using drop hammer method / Muhamad Fahmi Hussin
title_short The process of piling work using drop hammer method / Muhamad Fahmi Hussin
title_full The process of piling work using drop hammer method / Muhamad Fahmi Hussin
title_fullStr The process of piling work using drop hammer method / Muhamad Fahmi Hussin
title_full_unstemmed The process of piling work using drop hammer method / Muhamad Fahmi Hussin
title_sort process of piling work using drop hammer method / muhamad fahmi hussin
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/60185/1/60185.pdf
https://ir.uitm.edu.my/id/eprint/60185/
_version_ 1734303076031922176
score 13.211869