Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop

Investing to the construction project does not promise a profit to the clients. The project can be delay or worse, which is abandonment. Each client want their project going well so they can meet their objectives. Therefore, this research aim to minimize the delay of building construction completion...

Full description

Saved in:
Bibliographic Details
Main Authors: Abd Rashid, Muhammad Tarmizi, Lop, Nor Suzila
Format: Conference or Workshop Item
Language:English
Published: 2020
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/57781/1/57781.pdf
https://ir.uitm.edu.my/id/eprint/57781/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.57781
record_format eprints
spelling my.uitm.ir.577812022-06-09T09:04:51Z https://ir.uitm.edu.my/id/eprint/57781/ Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop Abd Rashid, Muhammad Tarmizi Lop, Nor Suzila TH Building construction Building failures, errors, defects, etc. Investing to the construction project does not promise a profit to the clients. The project can be delay or worse, which is abandonment. Each client want their project going well so they can meet their objectives. Therefore, this research aim to minimize the delay of building construction completion in Malaysia. The objectives of this research are (i) To identify the factors affecting delays of building construction completion in Malaysia (ii) To determine the effects of building construction completion delays to the clients, consultants and contractors (iii) To suggest action that could minimize building construction delays. In order to achieve the objectives, 90 questionnaires were distributed to the project clients, contractors, and construction consultant. Clients often change order during construction phase frequently is the main factor affecting delays, clients delay getting profit from the development as the main effect of delays and clients should ease the interim payment and do it on time as the main steps to minimize delays. 2020 Conference or Workshop Item PeerReviewed text en https://ir.uitm.edu.my/id/eprint/57781/1/57781.pdf Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop. (2020) In: QS Colloquium 2020 Series XII.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Building failures, errors, defects, etc.
spellingShingle TH Building construction
Building failures, errors, defects, etc.
Abd Rashid, Muhammad Tarmizi
Lop, Nor Suzila
Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop
description Investing to the construction project does not promise a profit to the clients. The project can be delay or worse, which is abandonment. Each client want their project going well so they can meet their objectives. Therefore, this research aim to minimize the delay of building construction completion in Malaysia. The objectives of this research are (i) To identify the factors affecting delays of building construction completion in Malaysia (ii) To determine the effects of building construction completion delays to the clients, consultants and contractors (iii) To suggest action that could minimize building construction delays. In order to achieve the objectives, 90 questionnaires were distributed to the project clients, contractors, and construction consultant. Clients often change order during construction phase frequently is the main factor affecting delays, clients delay getting profit from the development as the main effect of delays and clients should ease the interim payment and do it on time as the main steps to minimize delays.
format Conference or Workshop Item
author Abd Rashid, Muhammad Tarmizi
Lop, Nor Suzila
author_facet Abd Rashid, Muhammad Tarmizi
Lop, Nor Suzila
author_sort Abd Rashid, Muhammad Tarmizi
title Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop
title_short Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop
title_full Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop
title_fullStr Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop
title_full_unstemmed Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop
title_sort building construction completion delays: factors and effects / muhammad tarmizi abd rashid and sr. dr. nor suzila lop
publishDate 2020
url https://ir.uitm.edu.my/id/eprint/57781/1/57781.pdf
https://ir.uitm.edu.my/id/eprint/57781/
_version_ 1735389618852855808
score 13.211869