Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid
This practical training report is about the site monitoring of installation paver and pebble wash at Dataran Warisan Taiping. I made this practical training report based on my all senses and experience for 4 months in the company. This practical training report are divided into several section, whic...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/57041/1/57041.pdf https://ir.uitm.edu.my/id/eprint/57041/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.57041 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.570412022-03-14T04:08:48Z https://ir.uitm.edu.my/id/eprint/57041/ Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid Hamid, Mohamad Asyraf TH Building construction Details in building design and construction.Including walls, roofs Management of the construction site. Superintendence of building construction This practical training report is about the site monitoring of installation paver and pebble wash at Dataran Warisan Taiping. I made this practical training report based on my all senses and experience for 4 months in the company. This practical training report are divided into several section, which are company background, literature view, case study, problem and recommendation and conclusion. Based on my experience and observation at site and office, the site monitoring of installation paver and pebble wash at Dataran Warisan Taiping is complicated but yet not too hard to make record and understood. In this report, it is contain a summary of the definition of paver and pebble wash, type of pebble wash and how to install paver and pebble wash. Besides, there are several problem arise when starting, while and after doing this monitoring that I can identified and take the best solution to solve it. I also include with several recommendations from my state of view that can solve the problems that arise. In conclusion, site monitoring gives impact on our profession, the benefit and on how its help our world of construction. 2016 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/57041/1/57041.pdf ID57041 Hamid, Mohamad Asyraf (2016) Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid. [Student Project] |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction Details in building design and construction.Including walls, roofs Management of the construction site. Superintendence of building construction |
spellingShingle |
TH Building construction Details in building design and construction.Including walls, roofs Management of the construction site. Superintendence of building construction Hamid, Mohamad Asyraf Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid |
description |
This practical training report is about the site monitoring of installation paver and pebble wash at Dataran Warisan Taiping. I made this practical training report based on my all senses and experience for 4 months in the company. This practical training report are divided into several section, which are company background, literature view, case study, problem and recommendation and conclusion. Based on my experience and observation at site and office, the site monitoring of installation paver and pebble wash at Dataran Warisan Taiping is complicated but yet not too hard to make record and understood. In this report, it is contain a summary of the definition of paver and pebble wash, type of pebble wash and how to install paver and pebble wash. Besides, there are several problem arise when starting, while and after doing this monitoring that I can identified and take the best solution to solve it. I also include with several recommendations from my state of view that can solve the problems that arise. In conclusion, site monitoring gives impact on our profession, the benefit and on how its help our world of construction. |
format |
Student Project |
author |
Hamid, Mohamad Asyraf |
author_facet |
Hamid, Mohamad Asyraf |
author_sort |
Hamid, Mohamad Asyraf |
title |
Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid |
title_short |
Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid |
title_full |
Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid |
title_fullStr |
Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid |
title_full_unstemmed |
Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid |
title_sort |
site monitoring at dataran warisan (installation of paver and pebble wash) / mohamad asyraf hamid |
publishDate |
2016 |
url |
https://ir.uitm.edu.my/id/eprint/57041/1/57041.pdf https://ir.uitm.edu.my/id/eprint/57041/ |
_version_ |
1728054838397239296 |
score |
13.211869 |