Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid

This practical training report is about the site monitoring of installation paver and pebble wash at Dataran Warisan Taiping. I made this practical training report based on my all senses and experience for 4 months in the company. This practical training report are divided into several section, whic...

Full description

Saved in:
Bibliographic Details
Main Author: Hamid, Mohamad Asyraf
Format: Student Project
Language:English
Published: 2016
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/57041/1/57041.pdf
https://ir.uitm.edu.my/id/eprint/57041/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.57041
record_format eprints
spelling my.uitm.ir.570412022-03-14T04:08:48Z https://ir.uitm.edu.my/id/eprint/57041/ Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid Hamid, Mohamad Asyraf TH Building construction Details in building design and construction.Including walls, roofs Management of the construction site. Superintendence of building construction This practical training report is about the site monitoring of installation paver and pebble wash at Dataran Warisan Taiping. I made this practical training report based on my all senses and experience for 4 months in the company. This practical training report are divided into several section, which are company background, literature view, case study, problem and recommendation and conclusion. Based on my experience and observation at site and office, the site monitoring of installation paver and pebble wash at Dataran Warisan Taiping is complicated but yet not too hard to make record and understood. In this report, it is contain a summary of the definition of paver and pebble wash, type of pebble wash and how to install paver and pebble wash. Besides, there are several problem arise when starting, while and after doing this monitoring that I can identified and take the best solution to solve it. I also include with several recommendations from my state of view that can solve the problems that arise. In conclusion, site monitoring gives impact on our profession, the benefit and on how its help our world of construction. 2016 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/57041/1/57041.pdf ID57041 Hamid, Mohamad Asyraf (2016) Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid. [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Details in building design and construction.Including walls, roofs
Management of the construction site. Superintendence of building construction
spellingShingle TH Building construction
Details in building design and construction.Including walls, roofs
Management of the construction site. Superintendence of building construction
Hamid, Mohamad Asyraf
Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid
description This practical training report is about the site monitoring of installation paver and pebble wash at Dataran Warisan Taiping. I made this practical training report based on my all senses and experience for 4 months in the company. This practical training report are divided into several section, which are company background, literature view, case study, problem and recommendation and conclusion. Based on my experience and observation at site and office, the site monitoring of installation paver and pebble wash at Dataran Warisan Taiping is complicated but yet not too hard to make record and understood. In this report, it is contain a summary of the definition of paver and pebble wash, type of pebble wash and how to install paver and pebble wash. Besides, there are several problem arise when starting, while and after doing this monitoring that I can identified and take the best solution to solve it. I also include with several recommendations from my state of view that can solve the problems that arise. In conclusion, site monitoring gives impact on our profession, the benefit and on how its help our world of construction.
format Student Project
author Hamid, Mohamad Asyraf
author_facet Hamid, Mohamad Asyraf
author_sort Hamid, Mohamad Asyraf
title Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid
title_short Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid
title_full Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid
title_fullStr Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid
title_full_unstemmed Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid
title_sort site monitoring at dataran warisan (installation of paver and pebble wash) / mohamad asyraf hamid
publishDate 2016
url https://ir.uitm.edu.my/id/eprint/57041/1/57041.pdf
https://ir.uitm.edu.my/id/eprint/57041/
_version_ 1728054838397239296
score 13.211869