Dilapidation survey for infrastructure case study : Project cadangan perumahan bercampur berstrata di atas Lot 614 dan Lot 11, Pekan Templer, Daerah Gombak, Selangor Darul Ehsan untuk Tetuan Setia Eco Templer Son Bhd - Jalan Bukit Anaktakun / Nurul Iman Fakhira Mohd Nasir
This practical training report is about a process and what is Dilapidation Survey that alson known as Pre-Construction Condition Survey on Infrastructure only. Based on 4 months’ experience training in this particular industry that is building survey industry this report was made with all knowledge...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2018
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/50600/1/50600.pdf https://ir.uitm.edu.my/id/eprint/50600/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.50600 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.506002021-09-17T07:48:45Z https://ir.uitm.edu.my/id/eprint/50600/ Dilapidation survey for infrastructure case study : Project cadangan perumahan bercampur berstrata di atas Lot 614 dan Lot 11, Pekan Templer, Daerah Gombak, Selangor Darul Ehsan untuk Tetuan Setia Eco Templer Son Bhd - Jalan Bukit Anaktakun / Nurul Iman Fakhira Mohd Nasir Mohd Nasir, Nurul Iman Fakhira Sustainable architecture Malaysia Building inspection Building fittings and their installation Architectural engineering. Structural engineering of buildings Sustainable buildings. Sustainable construction This practical training report is about a process and what is Dilapidation Survey that alson known as Pre-Construction Condition Survey on Infrastructure only. Based on 4 months’ experience training in this particular industry that is building survey industry this report was made with all knowledge that have been learn. Based on experience doing an observation thru site and office, the Dilapidation Survey on Infrastructure need an understandingand familiar based on type of infrastructure that is commonly found on site this is because from that the survey during on site will be much easier. There are also many methods and process to do this Dilapidation Survey but in this case study do as the client need with company’s format. In this report, it is containing a summary of the definition of Pre-Construction Condition Survey along with Dilapidation Survey on Infrastructure, type of infrastructure, process from starting work until submitting the report, tools and equipment that been used during survey, method of taking record or data, the procedure how Dilapidation Survey is done follow the company’s SOP and finally the defect that found on site with the description of defect. Besides in this training report also identified several problem during my practical training and also indetified the solution with recommendation for each problem that arise. In conclusion, from all this practical training report this Dilapidation Survey gives impact on our profession and give benefit for our industry. Universiti Teknologi Mara, Perak 2018 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/50600/1/50600.pdf ID50600 Mohd Nasir, Nurul Iman Fakhira (2018) Dilapidation survey for infrastructure case study : Project cadangan perumahan bercampur berstrata di atas Lot 614 dan Lot 11, Pekan Templer, Daerah Gombak, Selangor Darul Ehsan untuk Tetuan Setia Eco Templer Son Bhd - Jalan Bukit Anaktakun / Nurul Iman Fakhira Mohd Nasir. Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Sustainable architecture Malaysia Building inspection Building fittings and their installation Architectural engineering. Structural engineering of buildings Sustainable buildings. Sustainable construction |
spellingShingle |
Sustainable architecture Malaysia Building inspection Building fittings and their installation Architectural engineering. Structural engineering of buildings Sustainable buildings. Sustainable construction Mohd Nasir, Nurul Iman Fakhira Dilapidation survey for infrastructure case study : Project cadangan perumahan bercampur berstrata di atas Lot 614 dan Lot 11, Pekan Templer, Daerah Gombak, Selangor Darul Ehsan untuk Tetuan Setia Eco Templer Son Bhd - Jalan Bukit Anaktakun / Nurul Iman Fakhira Mohd Nasir |
description |
This practical training report is about a process and what is Dilapidation Survey that alson known as Pre-Construction Condition Survey on Infrastructure only. Based on 4 months’ experience training in this particular industry that is building survey industry this report was made with all knowledge that have been learn. Based on experience doing an observation thru site and office, the Dilapidation Survey on Infrastructure need an understandingand familiar based on type of infrastructure that is commonly found on site this is because from that the survey during on site will be much easier. There are also many methods and process to do this Dilapidation Survey but in this case study do as the client need with company’s format. In this report, it is containing a summary of the definition of Pre-Construction Condition Survey along with Dilapidation Survey on Infrastructure, type of infrastructure, process from starting work until submitting the report, tools and equipment that been used during survey, method of taking record or data, the procedure how Dilapidation Survey is done follow the company’s SOP and finally the defect that found on site with the description of defect. Besides in this training report also identified several problem during my practical training and also indetified the solution with recommendation for each problem that arise. In conclusion, from all this practical training report this Dilapidation Survey gives impact on our profession and give benefit for our industry. |
format |
Monograph |
author |
Mohd Nasir, Nurul Iman Fakhira |
author_facet |
Mohd Nasir, Nurul Iman Fakhira |
author_sort |
Mohd Nasir, Nurul Iman Fakhira |
title |
Dilapidation survey for infrastructure case study : Project cadangan perumahan bercampur berstrata di atas Lot 614 dan Lot 11, Pekan Templer, Daerah Gombak, Selangor Darul Ehsan untuk Tetuan Setia Eco Templer Son Bhd - Jalan Bukit Anaktakun / Nurul Iman Fakhira Mohd Nasir |
title_short |
Dilapidation survey for infrastructure case study : Project cadangan perumahan bercampur berstrata di atas Lot 614 dan Lot 11, Pekan Templer, Daerah Gombak, Selangor Darul Ehsan untuk Tetuan Setia Eco Templer Son Bhd - Jalan Bukit Anaktakun / Nurul Iman Fakhira Mohd Nasir |
title_full |
Dilapidation survey for infrastructure case study : Project cadangan perumahan bercampur berstrata di atas Lot 614 dan Lot 11, Pekan Templer, Daerah Gombak, Selangor Darul Ehsan untuk Tetuan Setia Eco Templer Son Bhd - Jalan Bukit Anaktakun / Nurul Iman Fakhira Mohd Nasir |
title_fullStr |
Dilapidation survey for infrastructure case study : Project cadangan perumahan bercampur berstrata di atas Lot 614 dan Lot 11, Pekan Templer, Daerah Gombak, Selangor Darul Ehsan untuk Tetuan Setia Eco Templer Son Bhd - Jalan Bukit Anaktakun / Nurul Iman Fakhira Mohd Nasir |
title_full_unstemmed |
Dilapidation survey for infrastructure case study : Project cadangan perumahan bercampur berstrata di atas Lot 614 dan Lot 11, Pekan Templer, Daerah Gombak, Selangor Darul Ehsan untuk Tetuan Setia Eco Templer Son Bhd - Jalan Bukit Anaktakun / Nurul Iman Fakhira Mohd Nasir |
title_sort |
dilapidation survey for infrastructure case study : project cadangan perumahan bercampur berstrata di atas lot 614 dan lot 11, pekan templer, daerah gombak, selangor darul ehsan untuk tetuan setia eco templer son bhd - jalan bukit anaktakun / nurul iman fakhira mohd nasir |
publisher |
Universiti Teknologi Mara, Perak |
publishDate |
2018 |
url |
https://ir.uitm.edu.my/id/eprint/50600/1/50600.pdf https://ir.uitm.edu.my/id/eprint/50600/ |
_version_ |
1712288400519725056 |
score |
13.211869 |