Industries building system for school at Sekolah Menengah Beris Panchor 2 / Muhammad Firdaus Zakaria @ Ibrahim
This report is to present the system IBS in use for this building. It use the precast concrete for the structural this building. IBS can cut the cost and can short the period to finish the project. IBS is new in the Malaysia than the bigger country. Have many advantages use this system. It is becau...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2016
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/47354/1/47354.pdf http://ir.uitm.edu.my/id/eprint/47354/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|