Roof installation process using metal deck PU foam G28 Surau Taman Desa Seraya, Alor Setar / Muhamad Asyrof Abdul Halim

Arash Cipta Sdn Bhd is a construction company that registered with Contractor Service Center (PKK) in C class. This company also registered with Construction Industry Development Board (CIDB) Gred 5, Ministry of Financial, Suruhanjaya Perkhidmatan Air Negara class D and C, Telekom Malaysia Berhad, P...

Full description

Saved in:
Bibliographic Details
Main Author: Abdul Halim, Muhamad Asyrof
Format: Monograph
Language:English
Published: Universiti Teknologi Mara, Perak 2016
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/46582/1/46582.pdf
http://ir.uitm.edu.my/id/eprint/46582/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.46582
record_format eprints
spelling my.uitm.ir.465822021-05-28T07:34:15Z http://ir.uitm.edu.my/id/eprint/46582/ Roof installation process using metal deck PU foam G28 Surau Taman Desa Seraya, Alor Setar / Muhamad Asyrof Abdul Halim Abdul Halim, Muhamad Asyrof Details in building design and construction.Including walls, roofs Roofing Malaysia Architectural engineering. Structural engineering of buildings Sustainable buildings. Sustainable construction Arash Cipta Sdn Bhd is a construction company that registered with Contractor Service Center (PKK) in C class. This company also registered with Construction Industry Development Board (CIDB) Gred 5, Ministry of Financial, Suruhanjaya Perkhidmatan Air Negara class D and C, Telekom Malaysia Berhad, PROPEL, PLUS, FELCRA and other related company. ACSB provide building construction and civil engineering to the industry. ACSB was established in 2000 by Mohammad Fauzee Bin Mohamad. He has a certificate Diploma Politeknik in Civil Engineering and work with construction and development company, AIMA Construction Sdn. Bhd from 1st July 1991 to 30 September 2000. ACSB archive trust from government and private sector in construction because of the company work quality. Universiti Teknologi Mara, Perak 2016 Monograph NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/46582/1/46582.pdf ID46582 Abdul Halim, Muhamad Asyrof (2016) Roof installation process using metal deck PU foam G28 Surau Taman Desa Seraya, Alor Setar / Muhamad Asyrof Abdul Halim. Industrial / Practical Training Report. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Details in building design and construction.Including walls, roofs
Roofing
Malaysia
Architectural engineering. Structural engineering of buildings
Sustainable buildings. Sustainable construction
spellingShingle Details in building design and construction.Including walls, roofs
Roofing
Malaysia
Architectural engineering. Structural engineering of buildings
Sustainable buildings. Sustainable construction
Abdul Halim, Muhamad Asyrof
Roof installation process using metal deck PU foam G28 Surau Taman Desa Seraya, Alor Setar / Muhamad Asyrof Abdul Halim
description Arash Cipta Sdn Bhd is a construction company that registered with Contractor Service Center (PKK) in C class. This company also registered with Construction Industry Development Board (CIDB) Gred 5, Ministry of Financial, Suruhanjaya Perkhidmatan Air Negara class D and C, Telekom Malaysia Berhad, PROPEL, PLUS, FELCRA and other related company. ACSB provide building construction and civil engineering to the industry. ACSB was established in 2000 by Mohammad Fauzee Bin Mohamad. He has a certificate Diploma Politeknik in Civil Engineering and work with construction and development company, AIMA Construction Sdn. Bhd from 1st July 1991 to 30 September 2000. ACSB archive trust from government and private sector in construction because of the company work quality.
format Monograph
author Abdul Halim, Muhamad Asyrof
author_facet Abdul Halim, Muhamad Asyrof
author_sort Abdul Halim, Muhamad Asyrof
title Roof installation process using metal deck PU foam G28 Surau Taman Desa Seraya, Alor Setar / Muhamad Asyrof Abdul Halim
title_short Roof installation process using metal deck PU foam G28 Surau Taman Desa Seraya, Alor Setar / Muhamad Asyrof Abdul Halim
title_full Roof installation process using metal deck PU foam G28 Surau Taman Desa Seraya, Alor Setar / Muhamad Asyrof Abdul Halim
title_fullStr Roof installation process using metal deck PU foam G28 Surau Taman Desa Seraya, Alor Setar / Muhamad Asyrof Abdul Halim
title_full_unstemmed Roof installation process using metal deck PU foam G28 Surau Taman Desa Seraya, Alor Setar / Muhamad Asyrof Abdul Halim
title_sort roof installation process using metal deck pu foam g28 surau taman desa seraya, alor setar / muhamad asyrof abdul halim
publisher Universiti Teknologi Mara, Perak
publishDate 2016
url http://ir.uitm.edu.my/id/eprint/46582/1/46582.pdf
http://ir.uitm.edu.my/id/eprint/46582/
_version_ 1701165902826831872
score 13.222552