Construction of pile foundation for telecommunication tower / Muhamad Shazwan Nahar Adam
CALIPH XG ENGINEERING SDN. BHD. Once of company of bumiputera which is this company are start in 16 January 2016 and this company was register with Suruhanjaya Syarikat Malaysia with register number is 117146-W. The address of this company is No. 221, Tingkat Atas Taman Akasia , 06300 Kuala Nerang ,...
Saved in:
Main Author: | Adam, Muhamad Shazwan Nahar |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2017
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/46539/1/46539.pdf http://ir.uitm.edu.my/id/eprint/46539/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction of pile foundation for telecommunication tower / Muhammad Amzarfahmi Zubidi
by: Zubidi, Muhammad Amzarfahmi
Published: (2017) -
The installation of bored pile foundation / Nur Ashikin Abdul Rahman
by: Abdul Rahman, Nur Ashikin
Published: (2018) -
Comparative study on interpreting pile bearing capacity from CPT result / Nydia Mohamad Yatim
by: Mohamad Yatim, Nydia
Published: (2006) -
The process of piling work with bore pile method / Muhamad Afiq Azfar Mat Zin
by: Mat Zin, Muhamad Afiq Azfar
Published: (2014) -
Slope improvement using sheet pile / Muhamad Izzat Rosli
by: Rosli, Muhamad Izzat
Published: (2014)