Problem submission of the temporary permit (A case study at Pinang Tunggal) / Suhaiza Sairi
Alhamdulillah, lastly I was finished the task of BSR360 Practical Training.Learning the part of the building control with is the temporary permit of building during the training give me a spirit to know more about this permit. Before this I was learn the theory about the building Law which is how th...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2017
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/46297/1/46297.pdf http://ir.uitm.edu.my/id/eprint/46297/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.46297 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.462972021-05-18T08:51:22Z http://ir.uitm.edu.my/id/eprint/46297/ Problem submission of the temporary permit (A case study at Pinang Tunggal) / Suhaiza Sairi Sairi, Suhaiza Systems of building construction. Industrialized building Malaysia Management of the construction site. Superintendence of building construction Alhamdulillah, lastly I was finished the task of BSR360 Practical Training.Learning the part of the building control with is the temporary permit of building during the training give me a spirit to know more about this permit. Before this I was learn the theory about the building Law which is how the calculation of space of the building, learn about the renovation or extension the house using the law book services is uniform building by-laws 1984.For this time my experience as the practical student in MajlisPerbandaran Sungai PetaniI can learn more and detail about the specification of the building and I learn how to manage the payment of the temporary permit of the building temporary. After that,Building By laws are the rules and regulations set forth by the concerned government authorities and updated time to time. These regulations guide us about what to construct, how and where. All the government and non government authorities work according to the building by laws applicable in there locale. Any building plan submitted to the authorities which does not adhere to the building by laws of the authority concerned is not passed. Compliance to them is mandatory by law whereas non compliance is punishable. As these rules and regulations apply to all, it helps to bring about a more uniform development. The Building by law document may be a very lengthy document to read but it is worth reading to avoid future problems arising out of noncompliance. For the conclusion, the building law in the state is important to make sure the residents is good populations and it also help the people to get the resident or building become a good house with the long time. Universiti Teknologi Mara, Perak 2017 Monograph NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/46297/1/46297.pdf ID46297 Sairi, Suhaiza (2017) Problem submission of the temporary permit (A case study at Pinang Tunggal) / Suhaiza Sairi. Industrial / Practical Training Report. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Systems of building construction. Industrialized building Malaysia Management of the construction site. Superintendence of building construction |
spellingShingle |
Systems of building construction. Industrialized building Malaysia Management of the construction site. Superintendence of building construction Sairi, Suhaiza Problem submission of the temporary permit (A case study at Pinang Tunggal) / Suhaiza Sairi |
description |
Alhamdulillah, lastly I was finished the task of BSR360 Practical Training.Learning the part of the building control with is the temporary permit of building during the training give me a spirit to know more about this permit. Before this I was learn the theory about the building Law which is how the calculation of space of the building, learn about the renovation or extension the house using the law book services is uniform building by-laws 1984.For this time my experience as the practical student in MajlisPerbandaran Sungai PetaniI can learn more and detail about the specification of the building and I learn how to manage the payment of the temporary permit of the building temporary. After that,Building By laws are the rules and regulations set forth by the concerned government authorities and updated time to time. These regulations guide us about what to construct, how and where. All the government and non government authorities work according to the building by laws applicable in there locale. Any building plan submitted to the authorities which does not adhere to the building by laws of the authority concerned is not passed. Compliance to them is mandatory by law whereas non compliance is punishable. As these rules and regulations apply to all, it helps to bring about a more uniform development. The Building by law document may be a very lengthy document to read but it is worth reading to avoid future problems arising out of noncompliance. For the conclusion, the building law in the state is important to make sure the residents is good populations and it also help the people to get the resident or building become a good house with the long time. |
format |
Monograph |
author |
Sairi, Suhaiza |
author_facet |
Sairi, Suhaiza |
author_sort |
Sairi, Suhaiza |
title |
Problem submission of the temporary permit (A case study at Pinang Tunggal) / Suhaiza Sairi |
title_short |
Problem submission of the temporary permit (A case study at Pinang Tunggal) / Suhaiza Sairi |
title_full |
Problem submission of the temporary permit (A case study at Pinang Tunggal) / Suhaiza Sairi |
title_fullStr |
Problem submission of the temporary permit (A case study at Pinang Tunggal) / Suhaiza Sairi |
title_full_unstemmed |
Problem submission of the temporary permit (A case study at Pinang Tunggal) / Suhaiza Sairi |
title_sort |
problem submission of the temporary permit (a case study at pinang tunggal) / suhaiza sairi |
publisher |
Universiti Teknologi Mara, Perak |
publishDate |
2017 |
url |
http://ir.uitm.edu.my/id/eprint/46297/1/46297.pdf http://ir.uitm.edu.my/id/eprint/46297/ |
_version_ |
1701165869405569024 |
score |
13.222552 |