Planning and control of safety in the construction refurbishment project / Ahmad Ezanee Hashim.

This study discusses a critical investigation into the needs for and interest in planning and control of safety in large refurbishment construction projects. The investigation attempted to determine from the viewpoint of large scale contractors, those critical factors which affected and influenced t...

Full description

Saved in:
Bibliographic Details
Main Author: Hashim, Ahmad Ezanee
Format: Thesis
Language:English
Published: 2004
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/43428/1/43428.pdf
https://ir.uitm.edu.my/id/eprint/43428/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.43428
record_format eprints
spelling my.uitm.ir.434282021-08-31T16:13:38Z https://ir.uitm.edu.my/id/eprint/43428/ Planning and control of safety in the construction refurbishment project / Ahmad Ezanee Hashim. Hashim, Ahmad Ezanee Estimates. Measurements. Quantities and cost Management of the construction site. Superintendence of building construction Building fittings and their installation Protection of buildings. Including protection from dampness, fire, burglary This study discusses a critical investigation into the needs for and interest in planning and control of safety in large refurbishment construction projects. The investigation attempted to determine from the viewpoint of large scale contractors, those critical factors which affected and influenced the safety planning and control process as well as identifying areas that affected safety of construction projects. This study also highlights the influence of the integrative mechanisms employed by refurbishment firms and their influence in safety planning performance. The integrative mechanisms include recording information, supervision and monitoring, work schedules, training and orientation and information technology systems. In addition, this study also discusses how the management organization structure of the construction firms influences the extent of the integrative mechanism used in safety planning performance. Further, it also examines the effects of employees' interest that affect and influence the safety planning and control process. A preliminary postal survey was sent to large construction firms initially, followed by semi-structured interviews with safety planning managers and supervisors of the construction firms. A final postal survey was distributed to 45-safety planning and control managers of refurbishment construction firms within the Klang valley. A total of 30 completed questionnaires were analyzed in detail and formed the database for the quantitative analysis. In addition, 14 semi-structured interviews were carried out on managers from the 30 responding construction firms. In this study both qualitative and quantitative studies were used. The result of the study indicated that there was a general lack of safety interest attitude among employees in the sample studied. The lack of safety interest was due to safety ignorance, negligence, lack of safety experience, violation of safety procedures and attitudes. This study showed that the control of safety performance level depends upon controlling the interfaces between the various stages of the refurbishment construction process, i.e. pre-bid, post-bid and construction process. The planning performance measurements this study used were, cost variance, loss time variance, accidents and the extent of planning in the refurbishment projects. This study also identified that the integration mechanisms to be adopted in the safety planning and control process were equally based on the complexity of refurbishment projects, the management safety accountability of the refurbishment organizations and the safety performance targeted. 2004 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/43428/1/43428.pdf ID43428 Hashim, Ahmad Ezanee (2004) Planning and control of safety in the construction refurbishment project / Ahmad Ezanee Hashim. PhD thesis, thesis, Universiti Teknologi MARA.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Estimates. Measurements. Quantities and cost
Management of the construction site. Superintendence of building construction
Building fittings and their installation
Protection of buildings. Including protection from dampness, fire, burglary
spellingShingle Estimates. Measurements. Quantities and cost
Management of the construction site. Superintendence of building construction
Building fittings and their installation
Protection of buildings. Including protection from dampness, fire, burglary
Hashim, Ahmad Ezanee
Planning and control of safety in the construction refurbishment project / Ahmad Ezanee Hashim.
description This study discusses a critical investigation into the needs for and interest in planning and control of safety in large refurbishment construction projects. The investigation attempted to determine from the viewpoint of large scale contractors, those critical factors which affected and influenced the safety planning and control process as well as identifying areas that affected safety of construction projects. This study also highlights the influence of the integrative mechanisms employed by refurbishment firms and their influence in safety planning performance. The integrative mechanisms include recording information, supervision and monitoring, work schedules, training and orientation and information technology systems. In addition, this study also discusses how the management organization structure of the construction firms influences the extent of the integrative mechanism used in safety planning performance. Further, it also examines the effects of employees' interest that affect and influence the safety planning and control process. A preliminary postal survey was sent to large construction firms initially, followed by semi-structured interviews with safety planning managers and supervisors of the construction firms. A final postal survey was distributed to 45-safety planning and control managers of refurbishment construction firms within the Klang valley. A total of 30 completed questionnaires were analyzed in detail and formed the database for the quantitative analysis. In addition, 14 semi-structured interviews were carried out on managers from the 30 responding construction firms. In this study both qualitative and quantitative studies were used. The result of the study indicated that there was a general lack of safety interest attitude among employees in the sample studied. The lack of safety interest was due to safety ignorance, negligence, lack of safety experience, violation of safety procedures and attitudes. This study showed that the control of safety performance level depends upon controlling the interfaces between the various stages of the refurbishment construction process, i.e. pre-bid, post-bid and construction process. The planning performance measurements this study used were, cost variance, loss time variance, accidents and the extent of planning in the refurbishment projects. This study also identified that the integration mechanisms to be adopted in the safety planning and control process were equally based on the complexity of refurbishment projects, the management safety accountability of the refurbishment organizations and the safety performance targeted.
format Thesis
author Hashim, Ahmad Ezanee
author_facet Hashim, Ahmad Ezanee
author_sort Hashim, Ahmad Ezanee
title Planning and control of safety in the construction refurbishment project / Ahmad Ezanee Hashim.
title_short Planning and control of safety in the construction refurbishment project / Ahmad Ezanee Hashim.
title_full Planning and control of safety in the construction refurbishment project / Ahmad Ezanee Hashim.
title_fullStr Planning and control of safety in the construction refurbishment project / Ahmad Ezanee Hashim.
title_full_unstemmed Planning and control of safety in the construction refurbishment project / Ahmad Ezanee Hashim.
title_sort planning and control of safety in the construction refurbishment project / ahmad ezanee hashim.
publishDate 2004
url https://ir.uitm.edu.my/id/eprint/43428/1/43428.pdf
https://ir.uitm.edu.my/id/eprint/43428/
_version_ 1709671380439531520
score 13.211869