Identification of construction risks in construction industry scenario (case study: Penang) / Nordiana Mohd Isa
This study identified the construction risks in Penang construction industry scenario. For this purpose, a short questionnaire was designed and distributed personally to the randomly selected contractors in Penang. The data collections were used in determining the ranking of construction risks. The...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/33736/1/33736.pdf http://ir.uitm.edu.my/id/eprint/33736/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.33736 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.337362020-08-25T03:45:59Z http://ir.uitm.edu.my/id/eprint/33736/ Identification of construction risks in construction industry scenario (case study: Penang) / Nordiana Mohd Isa Mohd Isa, Nordiana Engineering as a profession. Engineers Malaysia Management of engineering works This study identified the construction risks in Penang construction industry scenario. For this purpose, a short questionnaire was designed and distributed personally to the randomly selected contractors in Penang. The data collections were used in determining the ranking of construction risks. The sample consists of 60 contractors in Penang, and then the data was colleted using self-administrated questionnaire. For the analysed of data the SPSS version 13.0 Software and Total Contribution Weightage Method have been used in determining the ranking. The result indicated that the highest ranking of construction risk is increase in price of construction materials followed by corruption and cash flows. The lowest ranking of construction risk is lack of construction materials. The interesting of this study is that, it determined the construction risk ranking due to the frequency of the risk faced. Construction risk is generally perceived as events that influence project objectives of cost, time and quality. It is important to know the risks that contractors faced because contractors would then be better prepared for the problems and difficulties that they may encounter in other projects, and thereby have higher chance of meeting with project success. The findings of this research will form the basis for extended investigation which aims to asses the risks factors that influence construction industry. 2007-05 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/33736/1/33736.pdf Mohd Isa, Nordiana (2007) Identification of construction risks in construction industry scenario (case study: Penang) / Nordiana Mohd Isa. [Student Project] (Unpublished) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Engineering as a profession. Engineers Malaysia Management of engineering works |
spellingShingle |
Engineering as a profession. Engineers Malaysia Management of engineering works Mohd Isa, Nordiana Identification of construction risks in construction industry scenario (case study: Penang) / Nordiana Mohd Isa |
description |
This study identified the construction risks in Penang construction industry scenario. For this purpose, a short questionnaire was designed and distributed personally to the randomly selected contractors in Penang. The data collections were used in determining the ranking of construction risks. The sample consists of 60 contractors in Penang, and then the data was colleted using self-administrated questionnaire. For the analysed of data the SPSS version 13.0 Software and Total Contribution Weightage Method have been used in determining the ranking. The result indicated that the highest ranking of construction risk is increase in price of construction materials followed by corruption and cash flows. The lowest ranking of construction risk is lack of construction materials. The interesting of this study is that, it determined the construction risk ranking due to the frequency of the risk faced. Construction risk is generally perceived as events that influence project objectives of cost, time and quality. It is important to know the risks that contractors faced because contractors would then be better prepared for the problems and difficulties that they may encounter in other projects, and thereby have higher chance of meeting with project success. The findings of this research will form the basis for extended investigation which aims to asses the risks factors that influence construction industry. |
format |
Student Project |
author |
Mohd Isa, Nordiana |
author_facet |
Mohd Isa, Nordiana |
author_sort |
Mohd Isa, Nordiana |
title |
Identification of construction risks in construction industry scenario (case study: Penang) / Nordiana Mohd Isa |
title_short |
Identification of construction risks in construction industry scenario (case study: Penang) / Nordiana Mohd Isa |
title_full |
Identification of construction risks in construction industry scenario (case study: Penang) / Nordiana Mohd Isa |
title_fullStr |
Identification of construction risks in construction industry scenario (case study: Penang) / Nordiana Mohd Isa |
title_full_unstemmed |
Identification of construction risks in construction industry scenario (case study: Penang) / Nordiana Mohd Isa |
title_sort |
identification of construction risks in construction industry scenario (case study: penang) / nordiana mohd isa |
publishDate |
2007 |
url |
http://ir.uitm.edu.my/id/eprint/33736/1/33736.pdf http://ir.uitm.edu.my/id/eprint/33736/ |
_version_ |
1685651098378960896 |
score |
13.211869 |