Proposed new interior design scheme of production house office at Lot 1A, 1B & 2, Block P1, Lorong Selangor, Gaya @ Melawati Urban 2, Taman Melawati 53100 Gombak, Selangor for CST Production / Siti Nuradibah Mohd Nordin

This report documentating the design process of the proposed new interior design of production house for CST Production. The proceedings are conducted by various ways of data collection. This report is a compilation of what researcher have to do to get an outcome based on the guidelines. This report...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Nordin, Siti Nuradibah
Format: Student Project
Language:English
Published: Faculty of Architecture, Planning and Surveying 2012
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/20389/1/PPd_SITI%20NURADIBAH%20MOHD%20NORDIN%20AP%2012_5.pdf
http://ir.uitm.edu.my/id/eprint/20389/
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first