Safety feature in installation Industrialized Building System (IBS) component / Syed Muhamad Jefri Syd Hamid

Industrialized Building System (IBS) is one of the technologies which can be categorized long-standing technology in developed countries. IBS is a technique whereby components are manufactured in a controlled environment, either at site or off site and transported, positioned and assembled into cons...

Full description

Saved in:
Bibliographic Details
Main Author: Syd Hamid, Syed Muhamad Jefri
Format: Student Project
Language:English
Published: Faculty of Architecture, Planning and Surveying 2013
Online Access:http://ir.uitm.edu.my/id/eprint/16648/2/PPb_SYED%20MUHAMAD%20JEFRI%20SYD%20HAMID%20AP%2013_5.pdf
http://ir.uitm.edu.my/id/eprint/16648/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.16648
record_format eprints
spelling my.uitm.ir.166482019-09-10T02:44:55Z http://ir.uitm.edu.my/id/eprint/16648/ Safety feature in installation Industrialized Building System (IBS) component / Syed Muhamad Jefri Syd Hamid Syd Hamid, Syed Muhamad Jefri Industrialized Building System (IBS) is one of the technologies which can be categorized long-standing technology in developed countries. IBS is a technique whereby components are manufactured in a controlled environment, either at site or off site and transported, positioned and assembled into construction work. IBS is also known as prefabricated, modem method of construction (MMC) and off-site construction. There are five categories of the IBS normally used in Malaysia which are precast concrete framing, panel and box systems, steel formwork system, prefabricated timber framing systems, and block work systems. Precast concrete is one of the main IBS category built in Malaysia since 1960s. The purpose of this study is to provide a general perspective of safety in precast concrete construction by achieving specific objectives which are study and investigate the best process of installation of IBS components at site and to study the safest method of IBS. The data were collected from three different case studies around Klang Valley. Some data from journal, articles, newspaper, and internet source also been used to support the research. The data that gathered from the case studies will be analyze and some data from the interview also been used. This study also can provide knowledge to contractors and workers about the safety aspect during installation of precast concrete components thus will decrease the percentage of accident and giving the high quality management of a construction project in the future. Faculty of Architecture, Planning and Surveying 2013 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/16648/2/PPb_SYED%20MUHAMAD%20JEFRI%20SYD%20HAMID%20AP%2013_5.pdf Syd Hamid, Syed Muhamad Jefri (2013) Safety feature in installation Industrialized Building System (IBS) component / Syed Muhamad Jefri Syd Hamid. [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
description Industrialized Building System (IBS) is one of the technologies which can be categorized long-standing technology in developed countries. IBS is a technique whereby components are manufactured in a controlled environment, either at site or off site and transported, positioned and assembled into construction work. IBS is also known as prefabricated, modem method of construction (MMC) and off-site construction. There are five categories of the IBS normally used in Malaysia which are precast concrete framing, panel and box systems, steel formwork system, prefabricated timber framing systems, and block work systems. Precast concrete is one of the main IBS category built in Malaysia since 1960s. The purpose of this study is to provide a general perspective of safety in precast concrete construction by achieving specific objectives which are study and investigate the best process of installation of IBS components at site and to study the safest method of IBS. The data were collected from three different case studies around Klang Valley. Some data from journal, articles, newspaper, and internet source also been used to support the research. The data that gathered from the case studies will be analyze and some data from the interview also been used. This study also can provide knowledge to contractors and workers about the safety aspect during installation of precast concrete components thus will decrease the percentage of accident and giving the high quality management of a construction project in the future.
format Student Project
author Syd Hamid, Syed Muhamad Jefri
spellingShingle Syd Hamid, Syed Muhamad Jefri
Safety feature in installation Industrialized Building System (IBS) component / Syed Muhamad Jefri Syd Hamid
author_facet Syd Hamid, Syed Muhamad Jefri
author_sort Syd Hamid, Syed Muhamad Jefri
title Safety feature in installation Industrialized Building System (IBS) component / Syed Muhamad Jefri Syd Hamid
title_short Safety feature in installation Industrialized Building System (IBS) component / Syed Muhamad Jefri Syd Hamid
title_full Safety feature in installation Industrialized Building System (IBS) component / Syed Muhamad Jefri Syd Hamid
title_fullStr Safety feature in installation Industrialized Building System (IBS) component / Syed Muhamad Jefri Syd Hamid
title_full_unstemmed Safety feature in installation Industrialized Building System (IBS) component / Syed Muhamad Jefri Syd Hamid
title_sort safety feature in installation industrialized building system (ibs) component / syed muhamad jefri syd hamid
publisher Faculty of Architecture, Planning and Surveying
publishDate 2013
url http://ir.uitm.edu.my/id/eprint/16648/2/PPb_SYED%20MUHAMAD%20JEFRI%20SYD%20HAMID%20AP%2013_5.pdf
http://ir.uitm.edu.my/id/eprint/16648/
_version_ 1685648831816925184
score 13.211869