Reinforced concrete building design project & project based learning / Nurul Uzma Hamzah
To sum up this project, I have gained knowledge of rnanua] calculation techniques for building structural members. This report uses Prokon 5.0 to perform both manual and software calculations, and the values are based on my own assumptions. Before moving on with actual building work, all calculation...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2023
|
Online Access: | https://ir.uitm.edu.my/id/eprint/104141/1/104141.pdf https://ir.uitm.edu.my/id/eprint/104141/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | To sum up this project, I have gained knowledge of rnanua] calculation techniques for building structural members. This report uses Prokon 5.0 to perform both manual and software calculations, and the values are based on my own assumptions. Before moving on with actual building work, all calculations in this report are referenced to the Eurocode2 to ensure that the design criteria are referred to the caku1ation method. But in order to create a building, a house, or any other structure, we must be familiar with every aspect of the architectural designs. This is necessary since we have to adhere to the architect's specifications. The next step is to- determine where to put the various structures, such as beams,columns, and loads on all slabs. After that, we may begin choosing the project's crucial structure and begin designing the building while taking that structure into account, such as the slabs and columns that will be joined to the vital beam. Detailing is essential on construction sites to ensure that the building is constructed exactly as specified in the contract document. Any omissions in the specifics will result in structural failure and unpleasant incidents happening on the job site. Regarding the case study, it is crucial to evaluate the flexible pavement design of the road before construction begins. This needs to be considered so that we may create the appropriate pavement type for construction area. Rechecking the calculated data is necessary to minimize any software or manual calculation error. |
---|