Reinforced concrete building design project based learning / Muhammad Aliff Syazwan Mustakim

To conclude this design works, all the elements was successfully designed as all the design passed in the analysis calculation. Furthermore, the comparison between the manual calculation and software calculation also did not exceed 30% in percentage error. This means that the calculation that was do...

Full description

Saved in:
Bibliographic Details
Main Author: Mustakim, Muhammad Aliff Syazwan
Format: Student Project
Language:English
Published: 2023
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/104112/1/104112.pdf
https://ir.uitm.edu.my/id/eprint/104112/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.104112
record_format eprints
spelling my.uitm.ir.1041122025-02-22T16:07:51Z https://ir.uitm.edu.my/id/eprint/104112/ Reinforced concrete building design project based learning / Muhammad Aliff Syazwan Mustakim Mustakim, Muhammad Aliff Syazwan Indexes (General) To conclude this design works, all the elements was successfully designed as all the design passed in the analysis calculation. Furthermore, the comparison between the manual calculation and software calculation also did not exceed 30% in percentage error. This means that the calculation that was done manually is still acceptable to be used if it were to be used in the real life. The uses of the software which is PRO KON practically ease the calculation process of the design works. However, we cannot neglect the manual way of calculating it as it is part of the traditional way. Sometimes, the software also makes mistakes and we needed to compare it with our manual calculation so we can identify the mistakes. We also need to calculate our cost of project accurately by using the taking-off sheet. With this way, we can estimate our cost with the lowest loss and waste. The total cost also can be known by the bill of quantities. We can know the current cost of each material and the total cost of designing each of the elements. Lastly, we can estimate the time needed to construct each of the elements by using Microsoft Project. With this software we can know the time required to complete the construction and the list of works that involved in the construction. With so, our project will become more organized and can complete in time required by the client. As known, if a project was not completed by the time, we will be fined by the client as we breach the contract. 2023 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/104112/1/104112.pdf Reinforced concrete building design project based learning / Muhammad Aliff Syazwan Mustakim. (2023) [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Indexes (General)
spellingShingle Indexes (General)
Mustakim, Muhammad Aliff Syazwan
Reinforced concrete building design project based learning / Muhammad Aliff Syazwan Mustakim
description To conclude this design works, all the elements was successfully designed as all the design passed in the analysis calculation. Furthermore, the comparison between the manual calculation and software calculation also did not exceed 30% in percentage error. This means that the calculation that was done manually is still acceptable to be used if it were to be used in the real life. The uses of the software which is PRO KON practically ease the calculation process of the design works. However, we cannot neglect the manual way of calculating it as it is part of the traditional way. Sometimes, the software also makes mistakes and we needed to compare it with our manual calculation so we can identify the mistakes. We also need to calculate our cost of project accurately by using the taking-off sheet. With this way, we can estimate our cost with the lowest loss and waste. The total cost also can be known by the bill of quantities. We can know the current cost of each material and the total cost of designing each of the elements. Lastly, we can estimate the time needed to construct each of the elements by using Microsoft Project. With this software we can know the time required to complete the construction and the list of works that involved in the construction. With so, our project will become more organized and can complete in time required by the client. As known, if a project was not completed by the time, we will be fined by the client as we breach the contract.
format Student Project
author Mustakim, Muhammad Aliff Syazwan
author_facet Mustakim, Muhammad Aliff Syazwan
author_sort Mustakim, Muhammad Aliff Syazwan
title Reinforced concrete building design project based learning / Muhammad Aliff Syazwan Mustakim
title_short Reinforced concrete building design project based learning / Muhammad Aliff Syazwan Mustakim
title_full Reinforced concrete building design project based learning / Muhammad Aliff Syazwan Mustakim
title_fullStr Reinforced concrete building design project based learning / Muhammad Aliff Syazwan Mustakim
title_full_unstemmed Reinforced concrete building design project based learning / Muhammad Aliff Syazwan Mustakim
title_sort reinforced concrete building design project based learning / muhammad aliff syazwan mustakim
publishDate 2023
url https://ir.uitm.edu.my/id/eprint/104112/1/104112.pdf
https://ir.uitm.edu.my/id/eprint/104112/
_version_ 1825165081165430784
score 13.239859