Analysis and calibration of a water distribution systems 9 a case study of Port Dickson (volume I/II) / Kamal Bahrin Jaafar

Water distribution system is a common topic among engineers and would-be engineers. Such topics about water distribution system always recur from time to time. This is partly due to the inefficient system of the existing water distribution systems. As such, a new research needs to be carried out. Th...

Full description

Saved in:
Bibliographic Details
Main Author: Jaafar, Kamal Bahrin
Format: Thesis
Language:English
Published: 1993
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/100719/1/100719.pdf
https://ir.uitm.edu.my/id/eprint/100719/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.100719
record_format eprints
spelling my.uitm.ir.1007192024-09-12T03:01:27Z https://ir.uitm.edu.my/id/eprint/100719/ Analysis and calibration of a water distribution systems 9 a case study of Port Dickson (volume I/II) / Kamal Bahrin Jaafar Jaafar, Kamal Bahrin Environmental engineering Water distribution system is a common topic among engineers and would-be engineers. Such topics about water distribution system always recur from time to time. This is partly due to the inefficient system of the existing water distribution systems. As such, a new research needs to be carried out. The main reason of this research is to identify an effective method of examining the problems that occur in a chosen system. In this project, the method used is the combination of the computer simulation and field measurement, based on base demand, demand weighting and demand pattern at nodes of the chosen system. During this project, two major problems have been encountered. One of the problems is leakage. While the other problem is the influence of coefficent of pipe (C) in the chosen pipe. Leakage, being one of the major problems of this project is measured by measuring the minimum night flow, legitimate night flow and T-factor. As for the second problem, mis project shows how the C value should be determined by using Wal&ld Technique. However, the ratio value of the headloss between the predicted and actual, should be more than one. 1993 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/100719/1/100719.pdf Analysis and calibration of a water distribution systems 9 a case study of Port Dickson (volume I/II) / Kamal Bahrin Jaafar. (1993) Advanced Diploma thesis, thesis, Universiti Teknologi MARA (UiTM). <http://terminalib.uitm.edu.my/100719.pdf>
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Environmental engineering
spellingShingle Environmental engineering
Jaafar, Kamal Bahrin
Analysis and calibration of a water distribution systems 9 a case study of Port Dickson (volume I/II) / Kamal Bahrin Jaafar
description Water distribution system is a common topic among engineers and would-be engineers. Such topics about water distribution system always recur from time to time. This is partly due to the inefficient system of the existing water distribution systems. As such, a new research needs to be carried out. The main reason of this research is to identify an effective method of examining the problems that occur in a chosen system. In this project, the method used is the combination of the computer simulation and field measurement, based on base demand, demand weighting and demand pattern at nodes of the chosen system. During this project, two major problems have been encountered. One of the problems is leakage. While the other problem is the influence of coefficent of pipe (C) in the chosen pipe. Leakage, being one of the major problems of this project is measured by measuring the minimum night flow, legitimate night flow and T-factor. As for the second problem, mis project shows how the C value should be determined by using Wal&ld Technique. However, the ratio value of the headloss between the predicted and actual, should be more than one.
format Thesis
author Jaafar, Kamal Bahrin
author_facet Jaafar, Kamal Bahrin
author_sort Jaafar, Kamal Bahrin
title Analysis and calibration of a water distribution systems 9 a case study of Port Dickson (volume I/II) / Kamal Bahrin Jaafar
title_short Analysis and calibration of a water distribution systems 9 a case study of Port Dickson (volume I/II) / Kamal Bahrin Jaafar
title_full Analysis and calibration of a water distribution systems 9 a case study of Port Dickson (volume I/II) / Kamal Bahrin Jaafar
title_fullStr Analysis and calibration of a water distribution systems 9 a case study of Port Dickson (volume I/II) / Kamal Bahrin Jaafar
title_full_unstemmed Analysis and calibration of a water distribution systems 9 a case study of Port Dickson (volume I/II) / Kamal Bahrin Jaafar
title_sort analysis and calibration of a water distribution systems 9 a case study of port dickson (volume i/ii) / kamal bahrin jaafar
publishDate 1993
url https://ir.uitm.edu.my/id/eprint/100719/1/100719.pdf
https://ir.uitm.edu.my/id/eprint/100719/
_version_ 1811598171042742272
score 13.223943