Measurements of mobile signal received power level at Ringlet, Cameron Highland, Malaysia
Tenaga Nasional, the electric utility company in Peninsular Malaysia have been installing electronic meters that can establish wireless connectivity over the mobile phone network since 2005. Several locations including Ringlet, Cameron Highland have been pointed out as having difficulties in estab...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English English |
Published: |
Science Publishing Corporation Inc.
2018
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/72765/1/72765%20Measurements%20of%20Mobile%20Signal.pdf http://irep.iium.edu.my/72765/14/72765%20Measurements%20of%20mobile%20signal%20received%20power%20level%20SCOPUS.pdf http://irep.iium.edu.my/72765/ https://www.sciencepubco.com/index.php/ijet/article/view/22771/11254 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.iium.irep.72765 |
---|---|
record_format |
dspace |
spelling |
my.iium.irep.727652019-06-21T03:55:01Z http://irep.iium.edu.my/72765/ Measurements of mobile signal received power level at Ringlet, Cameron Highland, Malaysia Suliman, S.H. Hashim, W. Ismail, Ahmad Fadzil Zakariya, Mohd Azman Yahya, A.S. Sauti, M.S. TK7800 Electronics. Computer engineering. Computer hardware. Photoelectronic devices Tenaga Nasional, the electric utility company in Peninsular Malaysia have been installing electronic meters that can establish wireless connectivity over the mobile phone network since 2005. Several locations including Ringlet, Cameron Highland have been pointed out as having difficulties in establishing a stable connection to the national main server. Empirical investigations had been carried out to determine the availability of service coverage and the associated signal received power levels at the said location. The findings are reported in this article. The outcomes from the measurement campaign were used to deduce the likely solution that is capable of establishing a more reliable link. Field trials involving installations of high-gain antennas and signal boosters as potential solutions were also carried out at selected sites within the district. It is the objective of the study to develop a total solution that can ultimately address the communication issue Science Publishing Corporation Inc. 2018 Article PeerReviewed application/pdf en http://irep.iium.edu.my/72765/1/72765%20Measurements%20of%20Mobile%20Signal.pdf application/pdf en http://irep.iium.edu.my/72765/14/72765%20Measurements%20of%20mobile%20signal%20received%20power%20level%20SCOPUS.pdf Suliman, S.H. and Hashim, W. and Ismail, Ahmad Fadzil and Zakariya, Mohd Azman and Yahya, A.S. and Sauti, M.S. (2018) Measurements of mobile signal received power level at Ringlet, Cameron Highland, Malaysia. International Journal of Engineering & Technology, 7 (4.35). pp. 404-409. ISSN 2227-524X https://www.sciencepubco.com/index.php/ijet/article/view/22771/11254 |
institution |
Universiti Islam Antarabangsa Malaysia |
building |
IIUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
International Islamic University Malaysia |
content_source |
IIUM Repository (IREP) |
url_provider |
http://irep.iium.edu.my/ |
language |
English English |
topic |
TK7800 Electronics. Computer engineering. Computer hardware. Photoelectronic devices |
spellingShingle |
TK7800 Electronics. Computer engineering. Computer hardware. Photoelectronic devices Suliman, S.H. Hashim, W. Ismail, Ahmad Fadzil Zakariya, Mohd Azman Yahya, A.S. Sauti, M.S. Measurements of mobile signal received power level at Ringlet, Cameron Highland, Malaysia |
description |
Tenaga Nasional, the electric utility company in Peninsular Malaysia have been installing electronic meters that can establish wireless
connectivity over the mobile phone network since 2005. Several locations including Ringlet, Cameron Highland have been pointed out as
having difficulties in establishing a stable connection to the national main server. Empirical investigations had been carried out to determine the availability of service coverage and the associated signal received power levels at the said location. The findings are reported in
this article. The outcomes from the measurement campaign were used to deduce the likely solution that is capable of establishing a more
reliable link. Field trials involving installations of high-gain antennas and signal boosters as potential solutions were also carried out at
selected sites within the district. It is the objective of the study to develop a total solution that can ultimately address the communication
issue |
format |
Article |
author |
Suliman, S.H. Hashim, W. Ismail, Ahmad Fadzil Zakariya, Mohd Azman Yahya, A.S. Sauti, M.S. |
author_facet |
Suliman, S.H. Hashim, W. Ismail, Ahmad Fadzil Zakariya, Mohd Azman Yahya, A.S. Sauti, M.S. |
author_sort |
Suliman, S.H. |
title |
Measurements of mobile signal received power level at
Ringlet, Cameron Highland, Malaysia |
title_short |
Measurements of mobile signal received power level at
Ringlet, Cameron Highland, Malaysia |
title_full |
Measurements of mobile signal received power level at
Ringlet, Cameron Highland, Malaysia |
title_fullStr |
Measurements of mobile signal received power level at
Ringlet, Cameron Highland, Malaysia |
title_full_unstemmed |
Measurements of mobile signal received power level at
Ringlet, Cameron Highland, Malaysia |
title_sort |
measurements of mobile signal received power level at
ringlet, cameron highland, malaysia |
publisher |
Science Publishing Corporation Inc. |
publishDate |
2018 |
url |
http://irep.iium.edu.my/72765/1/72765%20Measurements%20of%20Mobile%20Signal.pdf http://irep.iium.edu.my/72765/14/72765%20Measurements%20of%20mobile%20signal%20received%20power%20level%20SCOPUS.pdf http://irep.iium.edu.my/72765/ https://www.sciencepubco.com/index.php/ijet/article/view/22771/11254 |
_version_ |
1643620207899443200 |
score |
13.211869 |