Incomplete contract in private finance initiative(PFI): a modified Delphi study
Incomplete contract (IC) is a contract that fails to state all the parties’ rights and obligations, has gaps and ambiguities in its terms and conditions. Literature had discussed the reasons of IC are due to long duration of the contract, high risk and uncertainty, high transaction cost, bounded rat...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English English |
Published: |
American Scientific Publishers
2017
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/45973/8/45973_Incomplete%20contract%20in%20private.pdf http://irep.iium.edu.my/45973/9/45973_Incomplete%20contract%20in%20private_SCOPUS.pdf http://irep.iium.edu.my/45973/ http://www.ingentaconnect.com/content/asp/asl/2017/00000023/00000001/art00055 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.iium.irep.45973 |
---|---|
record_format |
dspace |
spelling |
my.iium.irep.459732018-03-21T04:29:10Z http://irep.iium.edu.my/45973/ Incomplete contract in private finance initiative(PFI): a modified Delphi study Mansor, Nur Syaimasyaza Ayob, Mohd Fairullazi Abdul Rashid, Khairuddin K Law (General) TH1000 Systems of building construction TH4021 Buildings. Construction with reference to use. TX955 Building operation and maintenance Incomplete contract (IC) is a contract that fails to state all the parties’ rights and obligations, has gaps and ambiguities in its terms and conditions. Literature had discussed the reasons of IC are due to long duration of the contract, high risk and uncertainty, high transaction cost, bounded rationality, and others. Private Finance Initiative (PFI) contracts are also inevitably incomplete. PFI involves the private sector to finance, design, construct, operate and maintain the asset through 20-30 years concession period. It is almost impossible for the parties to specify all potential contingencies that might occur throughout the contract period. IC could provide the necessary flexibility in the contract to deal with uncertainty. Nonetheless, it can cause inefficiencies and costs, hold-up problem, and others. This paper aims to investigate the presence of IC in PFI contract in Malaysia through a two-round modified Delphi method. 12 clauses are identified incomplete through literature review and content analysis, and it became the basis of the semi-structured questionnaire for the modified Delphi approach. The statistical descriptive analysis was used to analyze the data and the results found that out of 12 clauses, only 10 clauses were considered incomplete. American Scientific Publishers 2017-01 Article REM application/pdf en http://irep.iium.edu.my/45973/8/45973_Incomplete%20contract%20in%20private.pdf application/pdf en http://irep.iium.edu.my/45973/9/45973_Incomplete%20contract%20in%20private_SCOPUS.pdf Mansor, Nur Syaimasyaza and Ayob, Mohd Fairullazi and Abdul Rashid, Khairuddin (2017) Incomplete contract in private finance initiative(PFI): a modified Delphi study. Advanced Science Letters, 23 (1). pp. 227-231. ISSN 1936-6612 http://www.ingentaconnect.com/content/asp/asl/2017/00000023/00000001/art00055 10.1166/asl.2017.7141 |
institution |
Universiti Islam Antarabangsa Malaysia |
building |
IIUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
International Islamic University Malaysia |
content_source |
IIUM Repository (IREP) |
url_provider |
http://irep.iium.edu.my/ |
language |
English English |
topic |
K Law (General) TH1000 Systems of building construction TH4021 Buildings. Construction with reference to use. TX955 Building operation and maintenance |
spellingShingle |
K Law (General) TH1000 Systems of building construction TH4021 Buildings. Construction with reference to use. TX955 Building operation and maintenance Mansor, Nur Syaimasyaza Ayob, Mohd Fairullazi Abdul Rashid, Khairuddin Incomplete contract in private finance initiative(PFI): a modified Delphi study |
description |
Incomplete contract (IC) is a contract that fails to state all the parties’ rights and obligations, has gaps and ambiguities in its terms and conditions. Literature had discussed the reasons of IC are due to long duration of the contract, high risk and uncertainty, high transaction cost, bounded rationality, and others. Private Finance Initiative (PFI) contracts are also inevitably incomplete. PFI involves the private sector to finance, design, construct, operate and maintain the asset through 20-30 years concession period. It is almost impossible for the parties to specify all potential contingencies that might occur throughout the contract period. IC could provide the necessary flexibility in the contract to deal with uncertainty. Nonetheless, it can cause inefficiencies and costs, hold-up problem, and others. This paper aims to investigate the presence of IC in PFI contract in Malaysia through a two-round modified Delphi method. 12 clauses are identified incomplete through literature review and content analysis, and it became the basis of the semi-structured questionnaire for the modified Delphi approach. The statistical descriptive analysis was used to analyze the data and the results found that out of 12 clauses, only 10 clauses were considered incomplete. |
format |
Article |
author |
Mansor, Nur Syaimasyaza Ayob, Mohd Fairullazi Abdul Rashid, Khairuddin |
author_facet |
Mansor, Nur Syaimasyaza Ayob, Mohd Fairullazi Abdul Rashid, Khairuddin |
author_sort |
Mansor, Nur Syaimasyaza |
title |
Incomplete contract in private finance initiative(PFI): a modified Delphi study |
title_short |
Incomplete contract in private finance initiative(PFI): a modified Delphi study |
title_full |
Incomplete contract in private finance initiative(PFI): a modified Delphi study |
title_fullStr |
Incomplete contract in private finance initiative(PFI): a modified Delphi study |
title_full_unstemmed |
Incomplete contract in private finance initiative(PFI): a modified Delphi study |
title_sort |
incomplete contract in private finance initiative(pfi): a modified delphi study |
publisher |
American Scientific Publishers |
publishDate |
2017 |
url |
http://irep.iium.edu.my/45973/8/45973_Incomplete%20contract%20in%20private.pdf http://irep.iium.edu.my/45973/9/45973_Incomplete%20contract%20in%20private_SCOPUS.pdf http://irep.iium.edu.my/45973/ http://www.ingentaconnect.com/content/asp/asl/2017/00000023/00000001/art00055 |
_version_ |
1643612895067504640 |
score |
13.211869 |