Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project
The increased stiffness in competition has dramatically increased the risk occurrence in project delivery. As the number of projects grows, enterprises or project managers have to eventually run simultaneous projects. Risk management in such cases becomes extremely necessary as failure of one projec...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English English |
Published: |
2013
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/30846/1/Table_of_Content.pdf http://irep.iium.edu.my/30846/2/108.pdf http://irep.iium.edu.my/30846/ http://ict4m.org/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.iium.irep.30846 |
---|---|
record_format |
dspace |
spelling |
my.iium.irep.308462013-08-14T20:48:04Z http://irep.iium.edu.my/30846/ Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project Ibrahim, Jamaludin Wani, Sharyar Elsadig Adam, Mutasim Abdullahi, Husein Osman Shamsudin, Ahmad Faizul HD61 Risk Management T58.5 Information technology T58.6 Management information systems The increased stiffness in competition has dramatically increased the risk occurrence in project delivery. As the number of projects grows, enterprises or project managers have to eventually run simultaneous projects. Risk management in such cases becomes extremely necessary as failure of one project may lead to the near failure of all the parallel projects running under the same supervision. Therefore, it becomes necessary to understand the best practices for risk management in a parallel project operation environment. Though the issue is of high importance, yet not much has been discussed. This study was carried out in an enterprise environment whereby professionals of this field with high experience were interviewed and requested to share their experiences. The research results bear witness to the fact that risk is inevitable and leaves a strong negative impact on all the projects operating in parallel. As such there is a high need to understand the strategies and best practices that are being applied in this field to avoid heavy losses. We seek to apply lessons learned to managing the DBrain research project which has multiple collaborators working in parallel. 2013 Conference or Workshop Item REM application/pdf en http://irep.iium.edu.my/30846/1/Table_of_Content.pdf application/pdf en http://irep.iium.edu.my/30846/2/108.pdf Ibrahim, Jamaludin and Wani, Sharyar and Elsadig Adam, Mutasim and Abdullahi, Husein Osman and Shamsudin, Ahmad Faizul (2013) Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project. In: The 4th International Conference on Information & Communication Technology for the Muslim World (ICT4M), 25-27 Mar 2013, Rabat, Moroco. http://ict4m.org/ |
institution |
Universiti Islam Antarabangsa Malaysia |
building |
IIUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
International Islamic University Malaysia |
content_source |
IIUM Repository (IREP) |
url_provider |
http://irep.iium.edu.my/ |
language |
English English |
topic |
HD61 Risk Management T58.5 Information technology T58.6 Management information systems |
spellingShingle |
HD61 Risk Management T58.5 Information technology T58.6 Management information systems Ibrahim, Jamaludin Wani, Sharyar Elsadig Adam, Mutasim Abdullahi, Husein Osman Shamsudin, Ahmad Faizul Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project |
description |
The increased stiffness in competition has dramatically increased the risk occurrence in project delivery. As the number of projects grows, enterprises or project managers have to eventually run simultaneous projects. Risk management in such cases becomes extremely necessary as failure of one project may lead to the near failure of all the parallel projects running under the same supervision. Therefore, it becomes necessary to understand the best practices for risk management in a parallel project operation environment.
Though the issue is of high importance, yet not much has been discussed. This study was carried out in an enterprise environment whereby professionals of this field with high experience were interviewed and requested to share their experiences.
The research results bear witness to the fact that risk is inevitable and leaves a strong negative impact on all the projects operating in parallel. As such there is a high need to understand the strategies and best practices that are being applied in this field to avoid heavy losses. We seek to apply lessons learned to managing the DBrain research project which has multiple collaborators working in parallel. |
format |
Conference or Workshop Item |
author |
Ibrahim, Jamaludin Wani, Sharyar Elsadig Adam, Mutasim Abdullahi, Husein Osman Shamsudin, Ahmad Faizul |
author_facet |
Ibrahim, Jamaludin Wani, Sharyar Elsadig Adam, Mutasim Abdullahi, Husein Osman Shamsudin, Ahmad Faizul |
author_sort |
Ibrahim, Jamaludin |
title |
Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project |
title_short |
Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project |
title_full |
Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project |
title_fullStr |
Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project |
title_full_unstemmed |
Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project |
title_sort |
risk management in parallel projects: analysis & best practices and implications to generic dbrain (gdbrain) research project |
publishDate |
2013 |
url |
http://irep.iium.edu.my/30846/1/Table_of_Content.pdf http://irep.iium.edu.my/30846/2/108.pdf http://irep.iium.edu.my/30846/ http://ict4m.org/ |
_version_ |
1643609948239691776 |
score |
13.211869 |