Study of Flash Flood in UTP Academic Complex

It is important that every design of drainage system can meet the capacity of discharge in a catchment. This project objective is to evaluate the current drainage network and pond facilities in functioning to channel the stormwater directly to the main outlet located at l TP front gate and also t...

Full description

Saved in:
Bibliographic Details
Main Author: Azharul Fitri bin Abdul Nifa, Azharul Fitri
Format: Final Year Project
Language:English
Published: 2010
Subjects:
Online Access:http://utpedia.utp.edu.my/9/1/0001.pdf
http://utpedia.utp.edu.my/9/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items