An Integrated Approach for Scheduling and Real-time Optimization in a Refrigerated Gas Plant

Loji penyejukan gas (RGP) menghadapi cabaran-cabaran operasi melalui tiga cara iaitu: 1) di aliran masuk, gas mentah berbilang aliran dicampur-aduk hingga menyebabkan naik-turun dalam kadar aliran dan kandungan gas; 2) di dalam RGP, penutupan tidak berjadual sering terjadi akibat kepincangan pera...

Full description

Saved in:
Bibliographic Details
Main Author: YUSOFF, NOORYUSMIZA
Format: Thesis
Language:English
Published: 2009
Subjects:
Online Access:http://utpedia.utp.edu.my/8060/1/2009-An%20Integrated%20Approach%20For%20Scheduling%20And%20Real-Time%20Optimization%20In%20a%20Refrigerated%20Gas%20Plant.pdf
http://utpedia.utp.edu.my/8060/
Tags: Add Tag
No Tags, Be the first to tag this record!