An Integrated Approach for Scheduling and Real-time Optimization in a Refrigerated Gas Plant
Loji penyejukan gas (RGP) menghadapi cabaran-cabaran operasi melalui tiga cara iaitu: 1) di aliran masuk, gas mentah berbilang aliran dicampur-aduk hingga menyebabkan naik-turun dalam kadar aliran dan kandungan gas; 2) di dalam RGP, penutupan tidak berjadual sering terjadi akibat kepincangan pera...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/8060/1/2009-An%20Integrated%20Approach%20For%20Scheduling%20And%20Real-Time%20Optimization%20In%20a%20Refrigerated%20Gas%20Plant.pdf http://utpedia.utp.edu.my/8060/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|