Improvement of Cement Placement in Horizontal Wells by Liner Rotation Using CFD
Nowadays, efficient cementing job is a vital operation in the life of a well. Appropriate cement displacement can extend the life of the wellbore by providing long-term zonal isolation. However, cement displacement is challenging issue in horizontal wells, but achieving maximum isolation is possib...
Saved in:
Main Author: | Ali Mahmoudi, Ali Mahmoudi |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
Universiti Teknologi Petronas
2012
|
Online Access: | http://utpedia.utp.edu.my/5609/1/Ali%20Mahmoudi-Final%20Report.pdf http://utpedia.utp.edu.my/5609/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
CFD Simulation of the Effect of Drill Pipe Rotation on Cuttings Transport in Horizontal Wellbore using Newtonian Fluid
by: Alhemyari, Shehab Abdulwahid
Published: (2015) -
CFD of Viscoelastic Fluid in Horizontal Flow Pipes
by: Muhamad Zainurul Asyraf bin Ismail, Muhamad Zainurul Asyraf
Published: (2008) -
GEOPOLYMER CEMENT FOR OIL WELL WITH IMPROVED PROPERTIES
by: Wan Ahmad Fahmi Azrin Che Mohd, Wan Ahmad Fahmi Azrin
Published: (2011) -
Improvement of blended cement characteristics as possible alternative for oil well cement
by: Samsuri, Ariffin, et al.
Published: (1997) -
Iranian language learners' attitude, motivasion and performance toward learning vocabulary using computer assisted language learning
by: Mahmoudi, Elham
Published: (2012)