FOUNDATION FIELDBUS INTEROPERABILITY TEST AND SYSTEM CONFIGURATION AND DEVELOPMENT - FOXBORO

Before a new technology is introduced to the industry, it will undergo a few tests to make sure it is safe reliable and ready for implementation. Because of that, Petronas was doing this project to evaluate the suitability of Foundation Fieldbus being used at their plants. Foundation Fieldbus is dig...

Full description

Saved in:
Bibliographic Details
Main Author: Ab. Aziz, Ab. Wafi Bin
Format: Final Year Project
Language:English
Published: Universiti Teknologi PETRONAS 2009
Subjects:
Online Access:http://utpedia.utp.edu.my/4078/1/Final_Report.pdf
http://utpedia.utp.edu.my/4078/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utp-utpedia.4078
record_format eprints
spelling my-utp-utpedia.40782017-01-25T09:44:10Z http://utpedia.utp.edu.my/4078/ FOUNDATION FIELDBUS INTEROPERABILITY TEST AND SYSTEM CONFIGURATION AND DEVELOPMENT - FOXBORO Ab. Aziz, Ab. Wafi Bin TK Electrical engineering. Electronics Nuclear engineering Before a new technology is introduced to the industry, it will undergo a few tests to make sure it is safe reliable and ready for implementation. Because of that, Petronas was doing this project to evaluate the suitability of Foundation Fieldbus being used at their plants. Foundation Fieldbus is digital based communication that allow bidirectional signal transferring mode. This project is about doing basic tests of Foundation Fieldbus technology to make sure it is compatible enough to be implemented in industry especially in Malaysia. The main test is focused on the basic test that consists of commissioning, decommissioning, drop out test, and online device replacement test. This is to emulate the normal activities performed in a plant. The second part it focused on to stress test of the system. For stress test, it cover test for noise effect on the foundation fieldbus communication. This entire test is to measure the interoperability and reliability of the system being implemented in plant. From the overall test and finding, foundation fieldbus was achieved the required reliability and interoperability as specified by Petronas. Universiti Teknologi PETRONAS 2009-01 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/4078/1/Final_Report.pdf Ab. Aziz, Ab. Wafi Bin (2009) FOUNDATION FIELDBUS INTEROPERABILITY TEST AND SYSTEM CONFIGURATION AND DEVELOPMENT - FOXBORO. Universiti Teknologi PETRONAS.
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
language English
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Ab. Aziz, Ab. Wafi Bin
FOUNDATION FIELDBUS INTEROPERABILITY TEST AND SYSTEM CONFIGURATION AND DEVELOPMENT - FOXBORO
description Before a new technology is introduced to the industry, it will undergo a few tests to make sure it is safe reliable and ready for implementation. Because of that, Petronas was doing this project to evaluate the suitability of Foundation Fieldbus being used at their plants. Foundation Fieldbus is digital based communication that allow bidirectional signal transferring mode. This project is about doing basic tests of Foundation Fieldbus technology to make sure it is compatible enough to be implemented in industry especially in Malaysia. The main test is focused on the basic test that consists of commissioning, decommissioning, drop out test, and online device replacement test. This is to emulate the normal activities performed in a plant. The second part it focused on to stress test of the system. For stress test, it cover test for noise effect on the foundation fieldbus communication. This entire test is to measure the interoperability and reliability of the system being implemented in plant. From the overall test and finding, foundation fieldbus was achieved the required reliability and interoperability as specified by Petronas.
format Final Year Project
author Ab. Aziz, Ab. Wafi Bin
author_facet Ab. Aziz, Ab. Wafi Bin
author_sort Ab. Aziz, Ab. Wafi Bin
title FOUNDATION FIELDBUS INTEROPERABILITY TEST AND SYSTEM CONFIGURATION AND DEVELOPMENT - FOXBORO
title_short FOUNDATION FIELDBUS INTEROPERABILITY TEST AND SYSTEM CONFIGURATION AND DEVELOPMENT - FOXBORO
title_full FOUNDATION FIELDBUS INTEROPERABILITY TEST AND SYSTEM CONFIGURATION AND DEVELOPMENT - FOXBORO
title_fullStr FOUNDATION FIELDBUS INTEROPERABILITY TEST AND SYSTEM CONFIGURATION AND DEVELOPMENT - FOXBORO
title_full_unstemmed FOUNDATION FIELDBUS INTEROPERABILITY TEST AND SYSTEM CONFIGURATION AND DEVELOPMENT - FOXBORO
title_sort foundation fieldbus interoperability test and system configuration and development - foxboro
publisher Universiti Teknologi PETRONAS
publishDate 2009
url http://utpedia.utp.edu.my/4078/1/Final_Report.pdf
http://utpedia.utp.edu.my/4078/
_version_ 1739831107497492480
score 13.211869