FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING

This report is to discuss about the research and testing of Basic Interoperability Testing for Foundation Fieldbus system. The Foundation Fieldbus is the new protocol that used in the PETRONAS process plant. Since that, PETRONAS personnel get lack of training in handling this new system. Devices...

Full description

Saved in:
Bibliographic Details
Main Author: HASSAN, HANISAH
Format: Final Year Project
Language:English
Published: 2009
Online Access:http://utpedia.utp.edu.my/3283/1/0001.pdf
http://utpedia.utp.edu.my/3283/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utp-utpedia.3283
record_format eprints
spelling my-utp-utpedia.32832017-01-25T09:44:21Z http://utpedia.utp.edu.my/3283/ FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING HASSAN, HANISAH This report is to discuss about the research and testing of Basic Interoperability Testing for Foundation Fieldbus system. The Foundation Fieldbus is the new protocol that used in the PETRONAS process plant. Since that, PETRONAS personnel get lack of training in handling this new system. Devices that used in Foundation Fieldbus system can not work or interoperate with the devices from different manufacturers. This project is to perform the interoperability testing and the result will be used as the reference for Foundation Ficldbus system for PETRONAS personnel that handling this new system. Besides, the purpose of this project is to find out interoperability devices with the manufacturers system. The methodology towards achieving the objectives includes the theoretical and technical research, and testing the system and devices. Research and understanding of the project is very important. Some procedure needs to follow to get the desired result and accuracy and consistency of the result need to take to the consideration. The specific system need to conduct for the basic interoperability testing is Honeywell system. The tasks that should be done under this Basic Interoperability Test are device commissioning, device decommissioning, online device replacement, physical layer diagnostics, calibration function checks, and online parameter downloads. From this test, all the devices that had been tested were successfully done. The research for the Foundation Ficldbus should continuously perform to improve the system from time to time and the analysis of result and reports will use for a future research. 2009 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/3283/1/0001.pdf HASSAN, HANISAH (2009) FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING. UNSPECIFIED. (Unpublished)
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
language English
description This report is to discuss about the research and testing of Basic Interoperability Testing for Foundation Fieldbus system. The Foundation Fieldbus is the new protocol that used in the PETRONAS process plant. Since that, PETRONAS personnel get lack of training in handling this new system. Devices that used in Foundation Fieldbus system can not work or interoperate with the devices from different manufacturers. This project is to perform the interoperability testing and the result will be used as the reference for Foundation Ficldbus system for PETRONAS personnel that handling this new system. Besides, the purpose of this project is to find out interoperability devices with the manufacturers system. The methodology towards achieving the objectives includes the theoretical and technical research, and testing the system and devices. Research and understanding of the project is very important. Some procedure needs to follow to get the desired result and accuracy and consistency of the result need to take to the consideration. The specific system need to conduct for the basic interoperability testing is Honeywell system. The tasks that should be done under this Basic Interoperability Test are device commissioning, device decommissioning, online device replacement, physical layer diagnostics, calibration function checks, and online parameter downloads. From this test, all the devices that had been tested were successfully done. The research for the Foundation Ficldbus should continuously perform to improve the system from time to time and the analysis of result and reports will use for a future research.
format Final Year Project
author HASSAN, HANISAH
spellingShingle HASSAN, HANISAH
FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING
author_facet HASSAN, HANISAH
author_sort HASSAN, HANISAH
title FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING
title_short FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING
title_full FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING
title_fullStr FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING
title_full_unstemmed FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING
title_sort foundation fieldbus 1nteroperability testing
publishDate 2009
url http://utpedia.utp.edu.my/3283/1/0001.pdf
http://utpedia.utp.edu.my/3283/
_version_ 1739831024093757440
score 13.211869