FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING
This report is to discuss about the research and testing of Basic Interoperability Testing for Foundation Fieldbus system. The Foundation Fieldbus is the new protocol that used in the PETRONAS process plant. Since that, PETRONAS personnel get lack of training in handling this new system. Devices...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
2009
|
Online Access: | http://utpedia.utp.edu.my/3283/1/0001.pdf http://utpedia.utp.edu.my/3283/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utp-utpedia.3283 |
---|---|
record_format |
eprints |
spelling |
my-utp-utpedia.32832017-01-25T09:44:21Z http://utpedia.utp.edu.my/3283/ FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING HASSAN, HANISAH This report is to discuss about the research and testing of Basic Interoperability Testing for Foundation Fieldbus system. The Foundation Fieldbus is the new protocol that used in the PETRONAS process plant. Since that, PETRONAS personnel get lack of training in handling this new system. Devices that used in Foundation Fieldbus system can not work or interoperate with the devices from different manufacturers. This project is to perform the interoperability testing and the result will be used as the reference for Foundation Ficldbus system for PETRONAS personnel that handling this new system. Besides, the purpose of this project is to find out interoperability devices with the manufacturers system. The methodology towards achieving the objectives includes the theoretical and technical research, and testing the system and devices. Research and understanding of the project is very important. Some procedure needs to follow to get the desired result and accuracy and consistency of the result need to take to the consideration. The specific system need to conduct for the basic interoperability testing is Honeywell system. The tasks that should be done under this Basic Interoperability Test are device commissioning, device decommissioning, online device replacement, physical layer diagnostics, calibration function checks, and online parameter downloads. From this test, all the devices that had been tested were successfully done. The research for the Foundation Ficldbus should continuously perform to improve the system from time to time and the analysis of result and reports will use for a future research. 2009 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/3283/1/0001.pdf HASSAN, HANISAH (2009) FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING. UNSPECIFIED. (Unpublished) |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Electronic and Digitized Intellectual Asset |
url_provider |
http://utpedia.utp.edu.my/ |
language |
English |
description |
This report is to discuss about the research and testing of Basic Interoperability
Testing for Foundation Fieldbus system. The Foundation Fieldbus is the new protocol
that used in the PETRONAS process plant. Since that, PETRONAS personnel get lack of
training in handling this new system. Devices that used in Foundation Fieldbus system
can not work or interoperate with the devices from different manufacturers. This project
is to perform the interoperability testing and the result will be used as the reference for
Foundation Ficldbus system for PETRONAS personnel that handling this new system.
Besides, the purpose of this project is to find out interoperability devices with the
manufacturers system. The methodology towards achieving the objectives includes the
theoretical and technical research, and testing the system and devices. Research and
understanding of the project is very important. Some procedure needs to follow to get the
desired result and accuracy and consistency of the result need to take to the consideration.
The specific system need to conduct for the basic interoperability testing is Honeywell
system. The tasks that should be done under this Basic Interoperability Test are device
commissioning, device decommissioning, online device replacement, physical layer
diagnostics, calibration function checks, and online parameter downloads. From this test,
all the devices that had been tested were successfully done. The research for the
Foundation Ficldbus should continuously perform to improve the system from time to
time and the analysis of result and reports will use for a future research. |
format |
Final Year Project |
author |
HASSAN, HANISAH |
spellingShingle |
HASSAN, HANISAH FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING |
author_facet |
HASSAN, HANISAH |
author_sort |
HASSAN, HANISAH |
title |
FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING |
title_short |
FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING |
title_full |
FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING |
title_fullStr |
FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING |
title_full_unstemmed |
FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING |
title_sort |
foundation fieldbus 1nteroperability testing |
publishDate |
2009 |
url |
http://utpedia.utp.edu.my/3283/1/0001.pdf http://utpedia.utp.edu.my/3283/ |
_version_ |
1739831024093757440 |
score |
13.211869 |