DEVELOPMENT AND QUANTITATIVE EVALUATION OF LEADING AND LAGGING METRICS FOR PHA, OP, AND EPR FOR PROCESS SAFETY PERFORMANCE

To face the safety challenges in terms of process disasters, the Occupational Safety and Health Administration (OSHA) of the United States (US) enacted process safety management (PSM) standard having 14 elements in 1992.

Saved in:
Bibliographic Details
Main Author: SHAMIM, MUHAMMAD YASIR
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:http://utpedia.utp.edu.my/20238/1/MUHAMMAD%20YASIR%20SHAMIM.pdf
http://utpedia.utp.edu.my/20238/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utp-utpedia.20238
record_format eprints
spelling my-utp-utpedia.202382020-01-14T10:31:32Z http://utpedia.utp.edu.my/20238/ DEVELOPMENT AND QUANTITATIVE EVALUATION OF LEADING AND LAGGING METRICS FOR PHA, OP, AND EPR FOR PROCESS SAFETY PERFORMANCE SHAMIM, MUHAMMAD YASIR TP Chemical technology To face the safety challenges in terms of process disasters, the Occupational Safety and Health Administration (OSHA) of the United States (US) enacted process safety management (PSM) standard having 14 elements in 1992. 2019-01 Thesis NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/20238/1/MUHAMMAD%20YASIR%20SHAMIM.pdf SHAMIM, MUHAMMAD YASIR (2019) DEVELOPMENT AND QUANTITATIVE EVALUATION OF LEADING AND LAGGING METRICS FOR PHA, OP, AND EPR FOR PROCESS SAFETY PERFORMANCE. Masters thesis, Universiti Teknologi PETRONAS.
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
language English
topic TP Chemical technology
spellingShingle TP Chemical technology
SHAMIM, MUHAMMAD YASIR
DEVELOPMENT AND QUANTITATIVE EVALUATION OF LEADING AND LAGGING METRICS FOR PHA, OP, AND EPR FOR PROCESS SAFETY PERFORMANCE
description To face the safety challenges in terms of process disasters, the Occupational Safety and Health Administration (OSHA) of the United States (US) enacted process safety management (PSM) standard having 14 elements in 1992.
format Thesis
author SHAMIM, MUHAMMAD YASIR
author_facet SHAMIM, MUHAMMAD YASIR
author_sort SHAMIM, MUHAMMAD YASIR
title DEVELOPMENT AND QUANTITATIVE EVALUATION OF LEADING AND LAGGING METRICS FOR PHA, OP, AND EPR FOR PROCESS SAFETY PERFORMANCE
title_short DEVELOPMENT AND QUANTITATIVE EVALUATION OF LEADING AND LAGGING METRICS FOR PHA, OP, AND EPR FOR PROCESS SAFETY PERFORMANCE
title_full DEVELOPMENT AND QUANTITATIVE EVALUATION OF LEADING AND LAGGING METRICS FOR PHA, OP, AND EPR FOR PROCESS SAFETY PERFORMANCE
title_fullStr DEVELOPMENT AND QUANTITATIVE EVALUATION OF LEADING AND LAGGING METRICS FOR PHA, OP, AND EPR FOR PROCESS SAFETY PERFORMANCE
title_full_unstemmed DEVELOPMENT AND QUANTITATIVE EVALUATION OF LEADING AND LAGGING METRICS FOR PHA, OP, AND EPR FOR PROCESS SAFETY PERFORMANCE
title_sort development and quantitative evaluation of leading and lagging metrics for pha, op, and epr for process safety performance
publishDate 2019
url http://utpedia.utp.edu.my/20238/1/MUHAMMAD%20YASIR%20SHAMIM.pdf
http://utpedia.utp.edu.my/20238/
_version_ 1739832729688604672
score 13.211869