Protection Coordination Study for Upgrading Heglig Power Grid in Greater Nile Petroleum Operating Company
In Heglig field in southwest of Sudan the demand on electric power has increased greatly, although with so many challenges like frequent tripping due to natural circumstances and birds, and to serve these demands protection system is necessary to provide stable power supply to the wells according to...
Saved in:
Main Author: | Mohammed, Momin Alsir |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
2017
|
Online Access: | http://utpedia.utp.edu.my/19072/1/8-%20FINAL%20DISSERTATION.pdf http://utpedia.utp.edu.my/19072/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
In the shadow of asset security: Corporate social responsibility Programme by the greater Nile petroleum operating company (GNPOC), Republic of Sudan
by: Ghazali, Z., et al.
Published: (2014) -
Study of the effect of flow modifiers on the operation of Heglig-Port Sudan Pipeline
by: Mohyaldinn, M.E., et al.
Published: (2016) -
Study of the effect of flow modifiers on the operation of Heglig-Port Sudan Pipeline
by: Mohyaldinn, M.E., et al.
Published: (2016) -
Coordinated voltage control for power grid
by: Mahesvaran Sibeperegasam
Published: (2023) -
Recommended protection scheme setting coordination for nine busbars transmission grid
by: Saleem, Radhwan Mohammed
Published: (2015)