Optimization Of Cuf Generation During Parallel Operation With Electric Utility System
Optimization of CUF generation during parallel operation electric with utility system was taken as a title for Final Year Project. The objective of this project is to optimize real and reactive power output of CUF generation during parallel operation with electric utility system. During parallel ope...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project |
Published: |
Universiti Teknologi Petronas
2009
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/1626/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|