Development of Spreadsheet MRP model for Panel Front Door Left Hand Side Assembly

The project focus on the development spreedsheet model of material requirement planning (MRP) for panel front door left hand side assembly for an automotive part. The objective of the study was to identify the elements of MRP implementation and develop the model. Three major inputs required to deve...

Full description

Saved in:
Bibliographic Details
Main Author: Nazri Talib, Nazri
Format: Final Year Project
Language:English
English
English
English
English
English
English
English
English
Published: Universiti Teknologi Petronas 2010
Subjects:
Online Access:http://utpedia.utp.edu.my/1305/1/APPENDIX.pdf
http://utpedia.utp.edu.my/1305/2/CHAPTER_1.pdf
http://utpedia.utp.edu.my/1305/3/CHAPTER_2.pdf
http://utpedia.utp.edu.my/1305/4/CHAPTER_3.pdf
http://utpedia.utp.edu.my/1305/5/CHAPTER_4.pdf
http://utpedia.utp.edu.my/1305/6/CHAPTER_5.pdf
http://utpedia.utp.edu.my/1305/7/REFERENCE.pdf
http://utpedia.utp.edu.my/1305/8/Table_of_Contents.pdf
http://utpedia.utp.edu.my/1305/9/Title_Page.pdf
http://utpedia.utp.edu.my/1305/
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first