DESIGN AND ANALYSIS OF SURFACE FACILITIES AND DOWNHOLE COMPLETION OF UTP TEST WELL

Universiti Teknologi Petronas Test Well is a project where a shallow well will be specifically drill prior to teaching and research purpose. With a true vertical decided to be at minimum depth of150m (492 ft), the author had propose a several design of the casing and tubing completion to suit the...

Full description

Saved in:
Bibliographic Details
Main Author: Azmi, Mohd Shaiful Anuar
Format: Final Year Project
Language:English
Published: Universiti Teknologi PETRONAS 2011
Subjects:
Online Access:http://utpedia.utp.edu.my/10018/1/2011%20-%20Design%20%26%20Analysis%20of%20Surface%20Facilities%20%26%20Downhole%20Completion%20of%20UTP%20Test%20Well.pdf
http://utpedia.utp.edu.my/10018/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utp-utpedia.10018
record_format eprints
spelling my-utp-utpedia.100182017-01-25T09:42:35Z http://utpedia.utp.edu.my/10018/ DESIGN AND ANALYSIS OF SURFACE FACILITIES AND DOWNHOLE COMPLETION OF UTP TEST WELL Azmi, Mohd Shaiful Anuar T Technology (General) Universiti Teknologi Petronas Test Well is a project where a shallow well will be specifically drill prior to teaching and research purpose. With a true vertical decided to be at minimum depth of150m (492 ft), the author had propose a several design of the casing and tubing completion to suit the purpose of this project. This project having a bright future for the university as this ca1l be built as a training center fer the petroleum engineer students as it being the first research well ever being built in the South East Asia Region that may contribute into the knowledge development to our graduates. In this project, it will be divided into two parts: the surface facilities design and also subsurface completion design. The objective of this well is to design a gas cireulating system from the surface into the bottom hole and back to the surface in order to study the gas flow measurement. Since the liquid loading is collliilon phenomenon in gas wells, the study of liquid flow is also important in order to determine the critical flow rate. Therefore, it can be used to simulate a multiphase flow circulation for further research purpose. At first, this project is focus on the design of the well and completion tubing. The size of the well is decided to be 12 inch with the installation of9 5/8 inch of casing cemented from the surface wellhead. Next, the author will proposed a suitable complete surface facility for the multiple phase flow to be injected from the surface. Both design has to be honored several important parameters such as the gas and liquid flow mte whicli hilS been decided to be from the ra1lge of 0 to 300 Mscf/D a1ld liquid flow rate from 0 to 30 gal/min (43200 gal/day). There are a few issue need to be discussed that relate to the safety of the project and equipments and also the improvement that can be made in the future. As conclusion, the end resiilt of tlie project Will be produce witli that comply with the mtiltiphase flow sttidy for research and industrial purposes. Universiti Teknologi PETRONAS 2011-01 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/10018/1/2011%20-%20Design%20%26%20Analysis%20of%20Surface%20Facilities%20%26%20Downhole%20Completion%20of%20UTP%20Test%20Well.pdf Azmi, Mohd Shaiful Anuar (2011) DESIGN AND ANALYSIS OF SURFACE FACILITIES AND DOWNHOLE COMPLETION OF UTP TEST WELL. Universiti Teknologi PETRONAS. (Unpublished)
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
language English
topic T Technology (General)
spellingShingle T Technology (General)
Azmi, Mohd Shaiful Anuar
DESIGN AND ANALYSIS OF SURFACE FACILITIES AND DOWNHOLE COMPLETION OF UTP TEST WELL
description Universiti Teknologi Petronas Test Well is a project where a shallow well will be specifically drill prior to teaching and research purpose. With a true vertical decided to be at minimum depth of150m (492 ft), the author had propose a several design of the casing and tubing completion to suit the purpose of this project. This project having a bright future for the university as this ca1l be built as a training center fer the petroleum engineer students as it being the first research well ever being built in the South East Asia Region that may contribute into the knowledge development to our graduates. In this project, it will be divided into two parts: the surface facilities design and also subsurface completion design. The objective of this well is to design a gas cireulating system from the surface into the bottom hole and back to the surface in order to study the gas flow measurement. Since the liquid loading is collliilon phenomenon in gas wells, the study of liquid flow is also important in order to determine the critical flow rate. Therefore, it can be used to simulate a multiphase flow circulation for further research purpose. At first, this project is focus on the design of the well and completion tubing. The size of the well is decided to be 12 inch with the installation of9 5/8 inch of casing cemented from the surface wellhead. Next, the author will proposed a suitable complete surface facility for the multiple phase flow to be injected from the surface. Both design has to be honored several important parameters such as the gas and liquid flow mte whicli hilS been decided to be from the ra1lge of 0 to 300 Mscf/D a1ld liquid flow rate from 0 to 30 gal/min (43200 gal/day). There are a few issue need to be discussed that relate to the safety of the project and equipments and also the improvement that can be made in the future. As conclusion, the end resiilt of tlie project Will be produce witli that comply with the mtiltiphase flow sttidy for research and industrial purposes.
format Final Year Project
author Azmi, Mohd Shaiful Anuar
author_facet Azmi, Mohd Shaiful Anuar
author_sort Azmi, Mohd Shaiful Anuar
title DESIGN AND ANALYSIS OF SURFACE FACILITIES AND DOWNHOLE COMPLETION OF UTP TEST WELL
title_short DESIGN AND ANALYSIS OF SURFACE FACILITIES AND DOWNHOLE COMPLETION OF UTP TEST WELL
title_full DESIGN AND ANALYSIS OF SURFACE FACILITIES AND DOWNHOLE COMPLETION OF UTP TEST WELL
title_fullStr DESIGN AND ANALYSIS OF SURFACE FACILITIES AND DOWNHOLE COMPLETION OF UTP TEST WELL
title_full_unstemmed DESIGN AND ANALYSIS OF SURFACE FACILITIES AND DOWNHOLE COMPLETION OF UTP TEST WELL
title_sort design and analysis of surface facilities and downhole completion of utp test well
publisher Universiti Teknologi PETRONAS
publishDate 2011
url http://utpedia.utp.edu.my/10018/1/2011%20-%20Design%20%26%20Analysis%20of%20Surface%20Facilities%20%26%20Downhole%20Completion%20of%20UTP%20Test%20Well.pdf
http://utpedia.utp.edu.my/10018/
_version_ 1739831737998901248
score 13.211869