Public acceptance of smart flood mitigation in Puchong
In the past few years, flooding issue had become a frequent incident happened in the Puchong area. Although the government had allocated a huge budget in constructing the flood mitigation project, flooding issue still occurs frequently at the Damansara-Puchong Highway (LDP) located near the IOI Mall...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project / Dissertation / Thesis |
Published: |
2024
|
Subjects: | |
Online Access: | http://eprints.utar.edu.my/6415/1/1902390_FYP_Report_%2D_JIA_CHEN_CHONG.pdf http://eprints.utar.edu.my/6415/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utar-eprints.6415 |
---|---|
record_format |
eprints |
spelling |
my-utar-eprints.64152024-06-19T01:52:56Z Public acceptance of smart flood mitigation in Puchong Chong, Jia Chen TA Engineering (General). Civil engineering (General) TD Environmental technology. Sanitary engineering In the past few years, flooding issue had become a frequent incident happened in the Puchong area. Although the government had allocated a huge budget in constructing the flood mitigation project, flooding issue still occurs frequently at the Damansara-Puchong Highway (LDP) located near the IOI Mall in Puchong. Therefore, it is crucial for the authorities to resolve the problem that govern the public immediately. In order to improve the implementation of Smart Flood Mitigation in Puchong, this research study focuses on investigating the public acceptance on Smart Flood Mitigation in Puchong. The first objective established in this research study is to identify the variables affecting the public acceptance on Smart Flood Mitigation in Puchong. In this research study, there are four independent variables that affecting the public acceptance on Smart Flood Mitigation in Puchong which are the Perception, Awareness, Readiness, and Preparedness. In order to measure the relationship and the impact of the independent variables towards the dependent variable, questionnaire survey was designed to collect the opinion of the respondents. A total of 137 samples were collected and undergo analysis by using the SPSS software and SmartPLS 4. This research showed that the public readiness and public preparedness ranked at the top two that caused impacts towards the public acceptance on Smart Flood Mitigation in Puchong. The analyzed results proved that the public readiness is significant affecting the public acceptance on Smart Flood Mitigation in Puchong. This research study helps the government to review in order to effectively implement the Smart Flood Mitigation in the Puchong area to fight against the flooding issues. 2024 Final Year Project / Dissertation / Thesis NonPeerReviewed application/pdf http://eprints.utar.edu.my/6415/1/1902390_FYP_Report_%2D_JIA_CHEN_CHONG.pdf Chong, Jia Chen (2024) Public acceptance of smart flood mitigation in Puchong. Final Year Project, UTAR. http://eprints.utar.edu.my/6415/ |
institution |
Universiti Tunku Abdul Rahman |
building |
UTAR Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tunku Abdul Rahman |
content_source |
UTAR Institutional Repository |
url_provider |
http://eprints.utar.edu.my |
topic |
TA Engineering (General). Civil engineering (General) TD Environmental technology. Sanitary engineering |
spellingShingle |
TA Engineering (General). Civil engineering (General) TD Environmental technology. Sanitary engineering Chong, Jia Chen Public acceptance of smart flood mitigation in Puchong |
description |
In the past few years, flooding issue had become a frequent incident happened in the Puchong area. Although the government had allocated a huge budget in constructing the flood mitigation project, flooding issue still occurs frequently at the Damansara-Puchong Highway (LDP) located near the IOI Mall in Puchong. Therefore, it is crucial for the authorities to resolve the problem that govern the public immediately. In order to improve the implementation of Smart Flood Mitigation in Puchong, this research study focuses on investigating the public acceptance on Smart Flood Mitigation in Puchong. The first objective
established in this research study is to identify the variables affecting the public acceptance on Smart Flood Mitigation in Puchong. In this research study, there
are four independent variables that affecting the public acceptance on Smart Flood Mitigation in Puchong which are the Perception, Awareness, Readiness, and Preparedness. In order to measure the relationship and the impact of the
independent variables towards the dependent variable, questionnaire survey was designed to collect the opinion of the respondents. A total of 137 samples were collected and undergo analysis by using the SPSS software and SmartPLS 4.
This research showed that the public readiness and public preparedness ranked at the top two that caused impacts towards the public acceptance on Smart Flood Mitigation in Puchong. The analyzed results proved that the public readiness is significant affecting the public acceptance on Smart Flood Mitigation in Puchong. This research study helps the government to review in order to effectively implement the Smart Flood Mitigation in the Puchong area to fight
against the flooding issues.
|
format |
Final Year Project / Dissertation / Thesis |
author |
Chong, Jia Chen |
author_facet |
Chong, Jia Chen |
author_sort |
Chong, Jia Chen |
title |
Public acceptance of smart flood mitigation in Puchong |
title_short |
Public acceptance of smart flood mitigation in Puchong |
title_full |
Public acceptance of smart flood mitigation in Puchong |
title_fullStr |
Public acceptance of smart flood mitigation in Puchong |
title_full_unstemmed |
Public acceptance of smart flood mitigation in Puchong |
title_sort |
public acceptance of smart flood mitigation in puchong |
publishDate |
2024 |
url |
http://eprints.utar.edu.my/6415/1/1902390_FYP_Report_%2D_JIA_CHEN_CHONG.pdf http://eprints.utar.edu.my/6415/ |
_version_ |
1802982276266459136 |
score |
13.211869 |