Environmental management activities of an infrastructure development project: the case of Beris Dam, Malaysia
Development projects need to integrate environmental dimensions into project management functions to ensure successful implementation of environmental management and control practices throughout the development process. The management functions include the scope of work for environmental control, th...
Saved in:
Main Authors: | Nik Norulaini Nik Ab. Rahman,, Asyirah Abdul Rahim,, Fera Fizani Ahmad Fizri, |
---|---|
Format: | Article |
Language: | English |
Published: |
Environmental Management Society, Malaysia
2006
|
Online Access: | http://journalarticle.ukm.my/2242/1/2006_8_Nik%26Asyirah.pdf http://journalarticle.ukm.my/2242/ http://www.ems-malaysia.org/mjem/index.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Study On The Potential Of Inclusion Of Environmental Management Elements In Contract Documents Of Construction Projects In Malaysia
by: Abdul Rahim, Asyirah
Published: (2017) -
Dam Safety: Highlighted Issues and Reliable Assessment for the Sustainable Dam Infrastructure
by: Bashar N.A.M., et al.
Published: (2024) -
Two-dimensional dam break modelling of Beris Dam using HEC-RAS
by: Mohamad Nur, Azura, et al.
Published: (2022) -
DAM5323 - PROJECT MANAGEMENT & ECONOMICS
by: Past Year Exam Question
Published: (2023) -
A Study On The Potential Of Inclusion Of Environmental Management Elements In Contract Documents Of Construction Projects In Malaysia [TD428.C64 A861 2007 f rb].
by: Abdul Rahim, Asyirah
Published: (2007)