A systematic planning scheme for deployment of technology combined lean implementation framework

In this modern age, use of technology combined lean implementation framework seems beneficial which not only helps in lean implementation but also contributes to speed up the process with the availability of proper planning scheme. However, based on previous literature available, a gap has been obse...

Full description

Saved in:
Bibliographic Details
Main Authors: Rafique, M.Z., M.N.A. Rahman,, Raheem, A., Leuveano, R.A.C., N. Saibani,, N. Arsad,, W.H.W. Mahmood,, Amjad, M.S.
Format: Article
Language:English
Published: Penerbit Universiti Kebangsaan Malaysia 2022
Online Access:http://journalarticle.ukm.my/18733/1/03.pdf
http://journalarticle.ukm.my/18733/
https://www.ukm.my/jkukm/volume-3401-2022/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-ukm.journal.18733
record_format eprints
spelling my-ukm.journal.187332022-06-03T00:37:32Z http://journalarticle.ukm.my/18733/ A systematic planning scheme for deployment of technology combined lean implementation framework Rafique, M.Z. M.N.A. Rahman, Raheem, A. Leuveano, R.A.C. N. Saibani, N. Arsad, W.H.W. Mahmood, Amjad, M.S. In this modern age, use of technology combined lean implementation framework seems beneficial which not only helps in lean implementation but also contributes to speed up the process with the availability of proper planning scheme. However, based on previous literature available, a gap has been observed regarding the availability of “Systematic Planning Scheme” which is essential for the deployment of technology combined lean implementation frameworks. Based on this, the aim of this study is to propose “Systematic Planning Scheme” for such frameworks and since, lean has its stakes in a wide range of sectors but carries the maximum stake in the automotive industry (based on literature review utilized) so it is feasible to develop planning scheme for automotive sectors. With the help of data collection methods that have been utilized were field observations, on-site plant visits, and organizational documents in case study, a Systematic Planning Scheme has been developed. The designed systematic planning scheme critically required three steps which were team selection, phase wise distributions of work, and access to lean tools for lean implementation (by the team to implement framework. The contribution and significance of this study is the provisions of new planning strategy which carried originality in its structure by following three goal steps and visions to implement modern frameworks in a systemized way. Penerbit Universiti Kebangsaan Malaysia 2022 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/18733/1/03.pdf Rafique, M.Z. and M.N.A. Rahman, and Raheem, A. and Leuveano, R.A.C. and N. Saibani, and N. Arsad, and W.H.W. Mahmood, and Amjad, M.S. (2022) A systematic planning scheme for deployment of technology combined lean implementation framework. Jurnal Kejuruteraan, 34 (1). pp. 29-39. ISSN 0128-0198 https://www.ukm.my/jkukm/volume-3401-2022/
institution Universiti Kebangsaan Malaysia
building Tun Sri Lanang Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Kebangsaan Malaysia
content_source UKM Journal Article Repository
url_provider http://journalarticle.ukm.my/
language English
description In this modern age, use of technology combined lean implementation framework seems beneficial which not only helps in lean implementation but also contributes to speed up the process with the availability of proper planning scheme. However, based on previous literature available, a gap has been observed regarding the availability of “Systematic Planning Scheme” which is essential for the deployment of technology combined lean implementation frameworks. Based on this, the aim of this study is to propose “Systematic Planning Scheme” for such frameworks and since, lean has its stakes in a wide range of sectors but carries the maximum stake in the automotive industry (based on literature review utilized) so it is feasible to develop planning scheme for automotive sectors. With the help of data collection methods that have been utilized were field observations, on-site plant visits, and organizational documents in case study, a Systematic Planning Scheme has been developed. The designed systematic planning scheme critically required three steps which were team selection, phase wise distributions of work, and access to lean tools for lean implementation (by the team to implement framework. The contribution and significance of this study is the provisions of new planning strategy which carried originality in its structure by following three goal steps and visions to implement modern frameworks in a systemized way.
format Article
author Rafique, M.Z.
M.N.A. Rahman,
Raheem, A.
Leuveano, R.A.C.
N. Saibani,
N. Arsad,
W.H.W. Mahmood,
Amjad, M.S.
spellingShingle Rafique, M.Z.
M.N.A. Rahman,
Raheem, A.
Leuveano, R.A.C.
N. Saibani,
N. Arsad,
W.H.W. Mahmood,
Amjad, M.S.
A systematic planning scheme for deployment of technology combined lean implementation framework
author_facet Rafique, M.Z.
M.N.A. Rahman,
Raheem, A.
Leuveano, R.A.C.
N. Saibani,
N. Arsad,
W.H.W. Mahmood,
Amjad, M.S.
author_sort Rafique, M.Z.
title A systematic planning scheme for deployment of technology combined lean implementation framework
title_short A systematic planning scheme for deployment of technology combined lean implementation framework
title_full A systematic planning scheme for deployment of technology combined lean implementation framework
title_fullStr A systematic planning scheme for deployment of technology combined lean implementation framework
title_full_unstemmed A systematic planning scheme for deployment of technology combined lean implementation framework
title_sort systematic planning scheme for deployment of technology combined lean implementation framework
publisher Penerbit Universiti Kebangsaan Malaysia
publishDate 2022
url http://journalarticle.ukm.my/18733/1/03.pdf
http://journalarticle.ukm.my/18733/
https://www.ukm.my/jkukm/volume-3401-2022/
_version_ 1735387660412780544
score 13.211869