Implementation of reliability centred maintenance in maintaining medical equipment in hospital
Maintenance services are performed to ensure the equipment is operating according to manufacturer standard and maintained at desired level of quality. The implementation of properly scheduled of maintenance services may prevent unexpected breakdown and disruption of operational in a hospital. How...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Universiti Kebangsaan Malaysia
2019
|
Online Access: | http://journalarticle.ukm.my/13680/1/368-1425-1-PB.pdf http://journalarticle.ukm.my/13680/ http://spaj.ukm.my/jsb/index.php/jbp/issue/view/Special%20Issue |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-ukm.journal.13680 |
---|---|
record_format |
eprints |
spelling |
my-ukm.journal.136802019-11-22T21:36:12Z http://journalarticle.ukm.my/13680/ Implementation of reliability centred maintenance in maintaining medical equipment in hospital Siti Hajar Salim, Saiful Amri Mazlan, Siti Aisyah Salim, Maintenance services are performed to ensure the equipment is operating according to manufacturer standard and maintained at desired level of quality. The implementation of properly scheduled of maintenance services may prevent unexpected breakdown and disruption of operational in a hospital. However, in some cases, series of breakdown occurred with the maintenance services in-place. This raised the doubts on the reliability and effectiveness of the maintenance services that being exercised. In general, there are many types of maintenance services nonetheless which suit best for medical equipment need to be identified. This paper is to identify the right maintenance services for medical equipment in hospital using Reliability Centred Maintenance (RCM). The equipment was selected based on the criticality and the breakdown history. Failure factors of breakdown were identified and based on this data, a right maintenance services were recommended for the further action. Penerbit Universiti Kebangsaan Malaysia 2019 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/13680/1/368-1425-1-PB.pdf Siti Hajar Salim, and Saiful Amri Mazlan, and Siti Aisyah Salim, (2019) Implementation of reliability centred maintenance in maintaining medical equipment in hospital. Journal of Building Performance, 10 (2). pp. 76-84. ISSN 2180-2106 http://spaj.ukm.my/jsb/index.php/jbp/issue/view/Special%20Issue |
institution |
Universiti Kebangsaan Malaysia |
building |
Tun Sri Lanang Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Kebangsaan Malaysia |
content_source |
UKM Journal Article Repository |
url_provider |
http://journalarticle.ukm.my/ |
language |
English |
description |
Maintenance services are performed to ensure the equipment is operating according to manufacturer
standard and maintained at desired level of quality. The implementation of properly scheduled of
maintenance services may prevent unexpected breakdown and disruption of operational in a hospital.
However, in some cases, series of breakdown occurred with the maintenance services in-place. This
raised the doubts on the reliability and effectiveness of the maintenance services that being exercised.
In general, there are many types of maintenance services nonetheless which suit best for medical
equipment need to be identified. This paper is to identify the right maintenance services for medical
equipment in hospital using Reliability Centred Maintenance (RCM). The equipment was selected
based on the criticality and the breakdown history. Failure factors of breakdown were identified and
based on this data, a right maintenance services were recommended for the further action. |
format |
Article |
author |
Siti Hajar Salim, Saiful Amri Mazlan, Siti Aisyah Salim, |
spellingShingle |
Siti Hajar Salim, Saiful Amri Mazlan, Siti Aisyah Salim, Implementation of reliability centred maintenance in maintaining medical equipment in hospital |
author_facet |
Siti Hajar Salim, Saiful Amri Mazlan, Siti Aisyah Salim, |
author_sort |
Siti Hajar Salim, |
title |
Implementation of reliability centred maintenance in maintaining medical equipment in hospital |
title_short |
Implementation of reliability centred maintenance in maintaining medical equipment in hospital |
title_full |
Implementation of reliability centred maintenance in maintaining medical equipment in hospital |
title_fullStr |
Implementation of reliability centred maintenance in maintaining medical equipment in hospital |
title_full_unstemmed |
Implementation of reliability centred maintenance in maintaining medical equipment in hospital |
title_sort |
implementation of reliability centred maintenance in maintaining medical equipment in hospital |
publisher |
Penerbit Universiti Kebangsaan Malaysia |
publishDate |
2019 |
url |
http://journalarticle.ukm.my/13680/1/368-1425-1-PB.pdf http://journalarticle.ukm.my/13680/ http://spaj.ukm.my/jsb/index.php/jbp/issue/view/Special%20Issue |
_version_ |
1651868049074028544 |
score |
13.211869 |