Influence of construction interface management practice on project performance in Nigeria

To curb community influences on construction project performance at the delivery stage, a number of interface management practices (IMP) are increasingly adopted. This study determined the impact of these practices on project time performance. The objectives were to determine the effectiveness of...

Full description

Saved in:
Bibliographic Details
Main Authors: Ekung, S., Lashinde, A.
Format: Article
Language:English
Published: Penerbit Universiti Kebangsaan Malaysia 2018
Online Access:http://journalarticle.ukm.my/13440/1/247-1089-1-PB.pdf
http://journalarticle.ukm.my/13440/
http://spaj.ukm.my/jsb/index.php/jbp/issue/view/37
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-ukm.journal.13440
record_format eprints
spelling my-ukm.journal.134402019-09-28T01:15:49Z http://journalarticle.ukm.my/13440/ Influence of construction interface management practice on project performance in Nigeria Ekung, S. Lashinde, A. To curb community influences on construction project performance at the delivery stage, a number of interface management practices (IMP) are increasingly adopted. This study determined the impact of these practices on project time performance. The objectives were to determine the effectiveness of identified IMP, their level of use, and impacts on timely project delivery. The study adopted a mixed research approach involving semi-structured interview and questionnaire survey conducted in South-South and South-East, Nigeria. Data obtained from 127 stakeholders in 66 project cases were analysed using percentages and canonical correlation analysis. The results indicated that five out of 13 interface management practices validated were prevalently used in the study area, four of which are effective to achieve timely project delivery. The result also established a significant positive correlation between these practices and project time performance. The study concludes that early community involvement, use of community liaison person, communication management, and stakeholder management are important community-project organisation interface management practices with significant impacts on project time performance. The study recommends practices of hybrid application of one or more methods for optimal result based on varying levels of performance. Penerbit Universiti Kebangsaan Malaysia 2018 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/13440/1/247-1089-1-PB.pdf Ekung, S. and Lashinde, A. (2018) Influence of construction interface management practice on project performance in Nigeria. Journal of Building Performance, 9 (1). pp. 122-132. ISSN 2180-2106 http://spaj.ukm.my/jsb/index.php/jbp/issue/view/37
institution Universiti Kebangsaan Malaysia
building Perpustakaan Tun Sri Lanang Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Kebangsaan Malaysia
content_source UKM Journal Article Repository
url_provider http://journalarticle.ukm.my/
language English
description To curb community influences on construction project performance at the delivery stage, a number of interface management practices (IMP) are increasingly adopted. This study determined the impact of these practices on project time performance. The objectives were to determine the effectiveness of identified IMP, their level of use, and impacts on timely project delivery. The study adopted a mixed research approach involving semi-structured interview and questionnaire survey conducted in South-South and South-East, Nigeria. Data obtained from 127 stakeholders in 66 project cases were analysed using percentages and canonical correlation analysis. The results indicated that five out of 13 interface management practices validated were prevalently used in the study area, four of which are effective to achieve timely project delivery. The result also established a significant positive correlation between these practices and project time performance. The study concludes that early community involvement, use of community liaison person, communication management, and stakeholder management are important community-project organisation interface management practices with significant impacts on project time performance. The study recommends practices of hybrid application of one or more methods for optimal result based on varying levels of performance.
format Article
author Ekung, S.
Lashinde, A.
spellingShingle Ekung, S.
Lashinde, A.
Influence of construction interface management practice on project performance in Nigeria
author_facet Ekung, S.
Lashinde, A.
author_sort Ekung, S.
title Influence of construction interface management practice on project performance in Nigeria
title_short Influence of construction interface management practice on project performance in Nigeria
title_full Influence of construction interface management practice on project performance in Nigeria
title_fullStr Influence of construction interface management practice on project performance in Nigeria
title_full_unstemmed Influence of construction interface management practice on project performance in Nigeria
title_sort influence of construction interface management practice on project performance in nigeria
publisher Penerbit Universiti Kebangsaan Malaysia
publishDate 2018
url http://journalarticle.ukm.my/13440/1/247-1089-1-PB.pdf
http://journalarticle.ukm.my/13440/
http://spaj.ukm.my/jsb/index.php/jbp/issue/view/37
_version_ 1646024365884571648
score 13.211869