Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time

Project delay is the worldwide common., phenomena in construction industry. Therefore, it is particularly important that project planning and scheduling need to be implemented carefully and satisfactory with the purpose of completing the project successfully within the required timeframe. CPM has...

Full description

Saved in:
Bibliographic Details
Main Author: Lim, Celia Han Jia
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.intimal.edu.my/1258/1/BQSI%2012.pdf
http://eprints.intimal.edu.my/1258/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-inti-eprints.1258
record_format eprints
spelling my-inti-eprints.12582019-09-04T06:12:27Z http://eprints.intimal.edu.my/1258/ Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time Lim, Celia Han Jia T Technology (General) TH Building construction Project delay is the worldwide common., phenomena in construction industry. Therefore, it is particularly important that project planning and scheduling need to be implemented carefully and satisfactory with the purpose of completing the project successfully within the required timeframe. CPM has been proven to be the most useful technique for planning and scheduling the construction project. There are basically 3 studies have been carried to indicated the usage of CPM by Engineering News Record's (ENR) Top 400 Contractor. Based on the latest studies by Kelleher in 2004, the percentages of ENR Top 400 Contractor using CPM has grown up to 98% compared to the survey took place in 1990 and 1974, which is at 93% and 90% respectively. (Kelleher, 2004) Based on the research, the percentage of CPM usage has been increasing in the past few years. The ascending percentage does not occur without reason. The ordinary usage for CPM is for schedulling purpose, however, the areas of CPM application has been expanding over the years. This study show particular concern to determine the effectiveness of Critical Path Method (CPM) in scheduling a construction project. The study is focuses on the contractor's perception on CPM usage and to indicate the benefits of CPM applications that encountered by them. Based on the results, most of the respondents who implemented CPM agreed that this method beneficial their construction project. Although respondents did experience some problems during application of CPM, it does not affect them from keeping utilizing it 2014-04-01 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/1258/1/BQSI%2012.pdf Lim, Celia Han Jia (2014) Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time. Other thesis, INTI INTERNATIONAL UNIVERSITY.
institution INTI International University
building INTI Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider INTI International University
content_source INTI Institutional Repository
url_provider http://eprints.intimal.edu.my
language English
topic T Technology (General)
TH Building construction
spellingShingle T Technology (General)
TH Building construction
Lim, Celia Han Jia
Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time
description Project delay is the worldwide common., phenomena in construction industry. Therefore, it is particularly important that project planning and scheduling need to be implemented carefully and satisfactory with the purpose of completing the project successfully within the required timeframe. CPM has been proven to be the most useful technique for planning and scheduling the construction project. There are basically 3 studies have been carried to indicated the usage of CPM by Engineering News Record's (ENR) Top 400 Contractor. Based on the latest studies by Kelleher in 2004, the percentages of ENR Top 400 Contractor using CPM has grown up to 98% compared to the survey took place in 1990 and 1974, which is at 93% and 90% respectively. (Kelleher, 2004) Based on the research, the percentage of CPM usage has been increasing in the past few years. The ascending percentage does not occur without reason. The ordinary usage for CPM is for schedulling purpose, however, the areas of CPM application has been expanding over the years. This study show particular concern to determine the effectiveness of Critical Path Method (CPM) in scheduling a construction project. The study is focuses on the contractor's perception on CPM usage and to indicate the benefits of CPM applications that encountered by them. Based on the results, most of the respondents who implemented CPM agreed that this method beneficial their construction project. Although respondents did experience some problems during application of CPM, it does not affect them from keeping utilizing it
format Thesis
author Lim, Celia Han Jia
author_facet Lim, Celia Han Jia
author_sort Lim, Celia Han Jia
title Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time
title_short Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time
title_full Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time
title_fullStr Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time
title_full_unstemmed Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time
title_sort planning and scheduling technique in project management: a study on critical path method (cpm) to improve project completion time
publishDate 2014
url http://eprints.intimal.edu.my/1258/1/BQSI%2012.pdf
http://eprints.intimal.edu.my/1258/
_version_ 1646103792125476864
score 13.211869