Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan)
The main purpose of this study was to identify common problems that a contractor faces in the construction industry of Islamabad Rawalpindi and to recommend solution to those problems. The methodology of his study is divided into four main stages. The first stage was to narrow down some of the mo...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | http://eprints.intimal.edu.my/1109/1/BCEGI%2054.pdf http://eprints.intimal.edu.my/1109/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-inti-eprints.1109 |
---|---|
record_format |
eprints |
spelling |
my-inti-eprints.11092018-09-24T08:08:26Z http://eprints.intimal.edu.my/1109/ Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan) Ammar, Ahmed Abbasi TA Engineering (General). Civil engineering (General) The main purpose of this study was to identify common problems that a contractor faces in the construction industry of Islamabad Rawalpindi and to recommend solution to those problems. The methodology of his study is divided into four main stages. The first stage was to narrow down some of the most common problems that contractors generally face. Extensive literature was received and based on that, problems specific to contractors were identified. The second stage involved designing a questionnaire to record responses of individuals amongst the key sectors of construction industry. To achieve this precisely, the questionnaire was divided into four main segments. The first segment aimed at attaining respondent's background information, the second and third segment consisted of close-ended questions aimed at understanding key problems facing contractors and recommending potential solutions to those problems. The fourth section comprised of open-ended to record opinions, suggestions and personal experiences in facing and overcoming problems. The third stage comprised of conducting interviews from individuals who have been working in Islamabad and Rawalpindi for well over 10 years. The fourth stage was to analyse the responses and based on analysis the author narrowed down main problems that a contractor faces. The last part consisted of recommending solutions to the problems found through analysis. 2018-01-01 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/1109/1/BCEGI%2054.pdf Ammar, Ahmed Abbasi (2018) Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan). Other thesis, INTI INTERNATIONAL UNIVERSITY. |
institution |
INTI International University |
building |
INTI Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
INTI International University |
content_source |
INTI Institutional Repository |
url_provider |
http://eprints.intimal.edu.my |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Ammar, Ahmed Abbasi Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan) |
description |
The main purpose of this study was to identify common problems that a contractor faces in the construction industry of Islamabad Rawalpindi and to recommend solution to those problems. The methodology of his study is divided into four main stages. The first stage was to narrow down some of the most common problems that contractors generally face. Extensive literature was received and based on that, problems specific to contractors were identified. The second stage involved designing a questionnaire to record responses of individuals amongst the key sectors of construction industry. To achieve this precisely, the questionnaire was divided into four main segments. The first segment aimed at attaining respondent's background information, the second and third segment consisted of close-ended questions aimed at understanding key problems facing contractors and recommending potential solutions to those problems. The fourth section comprised of open-ended to record opinions, suggestions and personal experiences in facing and overcoming problems. The third stage comprised of conducting interviews from individuals who have been working in Islamabad and Rawalpindi for well over 10 years. The fourth stage was to analyse the responses and based on analysis the author narrowed down main problems that a contractor faces. The last part consisted of recommending solutions to the problems found through analysis. |
format |
Thesis |
author |
Ammar, Ahmed Abbasi |
author_facet |
Ammar, Ahmed Abbasi |
author_sort |
Ammar, Ahmed Abbasi |
title |
Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan) |
title_short |
Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan) |
title_full |
Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan) |
title_fullStr |
Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan) |
title_full_unstemmed |
Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan) |
title_sort |
issues contractor's face in the construction industry of slamabad and rawalpindi (pakistan) |
publishDate |
2018 |
url |
http://eprints.intimal.edu.my/1109/1/BCEGI%2054.pdf http://eprints.intimal.edu.my/1109/ |
_version_ |
1644541392072998912 |
score |
13.211869 |