Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan)

The main purpose of this study was to identify common problems that a contractor faces in the construction industry of Islamabad Rawalpindi and to recommend solution to those problems. The methodology of his study is divided into four main stages. The first stage was to narrow down some of the mo...

Full description

Saved in:
Bibliographic Details
Main Author: Ammar, Ahmed Abbasi
Format: Thesis
Language:English
Published: 2018
Subjects:
Online Access:http://eprints.intimal.edu.my/1109/1/BCEGI%2054.pdf
http://eprints.intimal.edu.my/1109/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-inti-eprints.1109
record_format eprints
spelling my-inti-eprints.11092018-09-24T08:08:26Z http://eprints.intimal.edu.my/1109/ Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan) Ammar, Ahmed Abbasi TA Engineering (General). Civil engineering (General) The main purpose of this study was to identify common problems that a contractor faces in the construction industry of Islamabad Rawalpindi and to recommend solution to those problems. The methodology of his study is divided into four main stages. The first stage was to narrow down some of the most common problems that contractors generally face. Extensive literature was received and based on that, problems specific to contractors were identified. The second stage involved designing a questionnaire to record responses of individuals amongst the key sectors of construction industry. To achieve this precisely, the questionnaire was divided into four main segments. The first segment aimed at attaining respondent's background information, the second and third segment consisted of close-ended questions aimed at understanding key problems facing contractors and recommending potential solutions to those problems. The fourth section comprised of open-ended to record opinions, suggestions and personal experiences in facing and overcoming problems. The third stage comprised of conducting interviews from individuals who have been working in Islamabad and Rawalpindi for well over 10 years. The fourth stage was to analyse the responses and based on analysis the author narrowed down main problems that a contractor faces. The last part consisted of recommending solutions to the problems found through analysis. 2018-01-01 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/1109/1/BCEGI%2054.pdf Ammar, Ahmed Abbasi (2018) Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan). Other thesis, INTI INTERNATIONAL UNIVERSITY.
institution INTI International University
building INTI Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider INTI International University
content_source INTI Institutional Repository
url_provider http://eprints.intimal.edu.my
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Ammar, Ahmed Abbasi
Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan)
description The main purpose of this study was to identify common problems that a contractor faces in the construction industry of Islamabad Rawalpindi and to recommend solution to those problems. The methodology of his study is divided into four main stages. The first stage was to narrow down some of the most common problems that contractors generally face. Extensive literature was received and based on that, problems specific to contractors were identified. The second stage involved designing a questionnaire to record responses of individuals amongst the key sectors of construction industry. To achieve this precisely, the questionnaire was divided into four main segments. The first segment aimed at attaining respondent's background information, the second and third segment consisted of close-ended questions aimed at understanding key problems facing contractors and recommending potential solutions to those problems. The fourth section comprised of open-ended to record opinions, suggestions and personal experiences in facing and overcoming problems. The third stage comprised of conducting interviews from individuals who have been working in Islamabad and Rawalpindi for well over 10 years. The fourth stage was to analyse the responses and based on analysis the author narrowed down main problems that a contractor faces. The last part consisted of recommending solutions to the problems found through analysis.
format Thesis
author Ammar, Ahmed Abbasi
author_facet Ammar, Ahmed Abbasi
author_sort Ammar, Ahmed Abbasi
title Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan)
title_short Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan)
title_full Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan)
title_fullStr Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan)
title_full_unstemmed Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan)
title_sort issues contractor's face in the construction industry of slamabad and rawalpindi (pakistan)
publishDate 2018
url http://eprints.intimal.edu.my/1109/1/BCEGI%2054.pdf
http://eprints.intimal.edu.my/1109/
_version_ 1644541392072998912
score 13.211869