Search Results - constructive method method

Refine Results
  1. 1

    Comparative Study on Precast and Conventional Building Constructions for Housing Project by Tan, Let Hui

    Published 2020
    “…It shows that the precast building construction method is more time effective with 158 days less as compared to conventional building construction method. …”
    Get full text
    Get full text
    Thesis
  2. 2

    Selection of method in construction industry by using AHP method by Nur Syafikah, Nasrudin

    Published 2018
    “…Method in construction industry is very important in construction industry. …”
    Get full text
    Get full text
    Get full text
    Undergraduates Project Papers
  3. 3

    Construction Waste: A Comparative Study between Conventional and Prefabrication Construction Method by Chai, Christina Lee na

    Published 2015
    “…In line with this, the study is carried out to analyse the types of construction waste in conventional method and prefabrication method and investigate the level of material wastage between conventional method and prefabrication method. …”
    Get full text
    Get full text
    Thesis
  4. 4

    Comparative study of structural steeland reinforced concrete method : a project management case study by Hu, Wei Kiet.

    Published 2004
    “…Structural steel construction has been quite common construction method in the world. …”
    Get full text
    Get full text
    Get full text
    Final Year Project Report / IMRAD
  5. 5

    A comparative study of construction waste generation rate based on different construction methods used in construction projects in Malaysia by Maniam, Haritharan

    Published 2019
    “…The aim of this study is to compare the construction waste generation rate between different construction methods. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  6. 6

    A study of safety work methods in the construction industry-perspective CIDB by Che Shafee, Muhammad Shazmie, Salleh, Nurul Azita

    Published 2015
    “…This study about to solve problems related to the safety work method in the construction industry. This study was conducted to identify the problem occurred among workers at the construction industry in Malaysia, to propose the safety work method in the construction industry and to develop a new model of safety work method in the construction industry.Data collection will be conducted by using qualitative methods by interview CIDB construction personnel.The expected finding from this study is can provide a solution for reduced the problem accident among workers construction site for give the best protection while at the site. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  7. 7

    The potential benefits of recycling construction wastes / Aldrinne Cyril by Cyril, Aldrinne

    Published 2021
    “…Recycling is one of the methods which focus on handling construction waste. …”
    Get full text
    Get full text
    Student Project
  8. 8

    Method of lock-up construction / Ahmad Zaidi Mohamed Anuar by Mohamed Anuar, Ahmad Zaidi

    Published 2013
    “…This report is divided into several parts, which started with the company background and the background of the construction project. As a result of study and observation found that the method of construction of the lock-up is not easy and it looks very different as compared to other construction methods. …”
    Get full text
    Get full text
    Monograph
  9. 9

    Multi-Attribute Utility Theory for Selecting an Appropriate Procurement Method in the Construction Projects by Sawalhi , Nabil I. El, Agha, Osama El

    Published 2017
    “…The study concludes that there is no variety of procurement methods used in the Gaza Strip construction industry, as a traditional procurement method is preferred. …”
    Get full text
    Get full text
    Get full text
    Article
  10. 10

    Comparative study of residential roof truss construction methods: prefabrication and built onsite by Mohd Sani, Mohd Syahrul Hisyam, Muftah, Fadhluhartini

    Published 2009
    “…Both prefabricated roof truss methods and onsite roof truss construction method are used currently. …”
    Get full text
    Get full text
    Conference or Workshop Item
  11. 11
  12. 12

    An analysis of delay factors affecting labour productivity in construction using / Noor Azizah Mohd Othman by Mohd Othman, Noor Azizah

    Published 1992
    “…Although the model may not always result in the development of optimal construction method productivity, it does provides the potential for local optimization for a given construction method. …”
    Get full text
    Get full text
    Thesis
  13. 13

    Risk management plan for slope repair using Terralink Construction Method alligning sustainable environment / Muhamad Afiq Al-Amin Mohd Kabri by Mohd Kabri, Muhamad Afiq Al-Amin

    Published 2025
    “…However, there is no existing risk management plan for the Terralink Construction Method. Hence, this study focuses on the Terralink Construction Method, a newly adopted technique in Malaysia, and aims to develop a risk management plan for slope repair using the Terralink Construction Method. …”
    Get full text
    Get full text
    Thesis
  14. 14

    The effect of different industrialized building system (IBS) construction methods compared to the conventional method on occupational safety and health (OSH) industry risks in construction by Mohd Amin, Mohamad Ariff

    Published 2021
    “…Improving the performance of the construction industry has pushed forward the need for innovation and adopting new construction methods and technologies in the industry. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  15. 15

    Beam, slab and shear wall construction / Muhammad Abdillah Mohamad Nor by Mohamad Nor, Muhammad Abdillah

    Published 2019
    “…Contractors are racing to provide the best quality and method for a construction project. This report discussed the construction method of Beam, Slab and Shear Wall. …”
    Get full text
    Get full text
    Monograph
  16. 16

    Drain closure: method and safety aspects / Ahmad Syahid Adnan by Adnan, Ahmad Syahid

    Published 2013
    “…In this report, a detailed explanation about the construction method of drain closure with explained safety aspects during the construction. …”
    Get full text
    Get full text
    Monograph
  17. 17

    Conflict and dispute reduction mechanism of procurement method for construction industry in Malaysia by Nurul Athirah, Mohd Nasir

    Published 2015
    “…The survey reveals that the most common used procurement methods, traditional procurement methods had the highest dispute rate comparing to other innovative procurement methods such as Design and Build, Construction Management and Partnering. …”
    Get full text
    Get full text
    Undergraduates Project Papers
  18. 18

    Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin by Saidin, Muhammad Aminuddin

    Published 2022
    “…Hope this report can provide knowledge to the reader about each construction method in order to construct the above ground level swimming pool.…”
    Get full text
    Get full text
    Monograph
  19. 19

    Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker by Tan, Swee Kok

    Published 2010
    “…Pre-fabrication construction method is not new in Malaysian construction industry yet the utilization of such method still relatively low. …”
    Get full text
    Get full text
    Thesis
  20. 20

    A method of evaluating safety Of construction Of infrastructure. by Noorzaei, Jamaloddin, Jaafar, Mohd Saleh, Mohammad, Thamer Ahmad, Abdulrazeg, Aeid. A., Khanehzaei, Parviz

    Published 2010
    “…A method of safety evaluation of roller compacted concrete dam during construction and operation phase wherein the RCC dam is constructible through a plurality of construction stages is provided, the method includes the steps of simulating a sequence of the plurality of construction stages, performing thermal analysis of the plurality of construction stages, performing structural analysis on the plurality of construction stages, performing crack prediction of the plurality of construction stages and recommending a safe sequence of the plurality of construction stages in addition to assessing the response of RCC dam during lifetime. …”
    Get full text
    Patent