Search Results - computer ((issues construction) OR (road construction)). programmed construction
Search alternatives:
- issues construction »
- road construction »
-
1
-
2
-
3
Development of flexible pavement design tool based on Jabatan Kerja Raya (JKR)’s revised guideline/ Mohamad Irwan P. Harahap
Published 2017“…In order to ensure standardization and compliance to the sanctioned road construction practice in the country, the Arahan Teknik (Jalan) 5/85 had been introduced and used extensively by the engineering community since 1985 for most of the road pavement design needs. …”
Get full text
Get full text
Get full text
Article -
4
Sensitivity analysis of an optimal access road location in hillyforest area: a GIS approach
Published 2008“…A computer programming using GIS, digital terrain data and sensitivity analysis for locating optimal forest road access in a hill area is presented. …”
Get full text
Get full text
Get full text
Article -
5
-
6
Compiler development in Component-oriented Software Development (COSD): Issues and challenges
Published 2023Conference Paper -
7
Multi depot dynamic vehicle routing problem with stochastic road capacity for emergency medical supply delivery in humanitarian logistics
Published 2022“…Specifically a PDS - Rollout Algorithm (PDS-RA) is adopted. Five variants of constructive base heuristics, Teach Based Insertion Heuristic (TBIH-1 - TBIH-5) are proposed complementing the PDSRA when dealing with the lookahead rollout involving stochastic road capacity. …”
Get full text
Get full text
Thesis -
8
Unattended sensors in marine environments: oxybuoy for hypoxia study
Published 2016Get full text
Get full text
Get full text
Book Chapter -
9
-
10
Hardware Implementation of Intelligent Traffic Light Controller
Published 2008Get full text
Learning Object -
11
Risk Analysis of Housing Projects in Malaysia Using an Industrialised Building System
Published 2008“…The study also identifies highly risked construction stages, determines risk allocation for sources of risk, and proposes a computer program for the risk management. …”
Get full text
Get full text
Thesis -
12
Traffic intensity monitoring using multiple object detection with traffic surveillance cameras
Published 2017“…The neural network toolbox is trained with positive and negative input to increase accuracy. The accuracy of the program is compared to other related works done and the trends of the traffic intensity from a road is also calculated. …”
Get full text
Get full text
Get full text
Proceeding Paper -
13
-
14
VARKonstruct: innovating sustainable education in construction technology through adaptive e-learning
Published 2025Get full text
Get full text
Conference or Workshop Item -
15
Remedial program learning application / Nor Anis Sofia Mohd Hasazli
Published 2020“…The development of RPLA was constructed using Unity, Audacity and Adobe Photoshop. …”
Get full text
Get full text
Thesis -
16
-
17
-
18
Employer’s expectation to QS graduates in facing Industrial Revolution 4.0 / Mohamad Zaifulzaki Kamde ... [et al.]
Published 2022“…Currently, the construction industry is facing a new phase of the industrial revolution where computers and robotics are implemented around the midst of the revolution thus bringing new technology that can give many benefits to the construction industry. …”
Get full text
Get full text
Conference or Workshop Item -
19
Traffic intensity monitoring using multiple object detection with traffic surveillance cameras
Published 2017“…The neural network toolbox is trained with positive and negative input to increase accuracy. The accuracy of the program is compared to other related works done and the trends of the traffic intensity from a road is also calculated. relevant articles in literature searches, great care should be taken in constructing both. …”
Get full text
Get full text
Get full text
Get full text
Proceeding Paper -
20
