Search Results - computer ((issues construction) OR (ibs construction)). programmed construction

Refine Results
  1. 1

    Risk Analysis of Housing Projects in Malaysia Using an Industrialised Building System by Abu Hasan Sazalli, Saiful Azri

    Published 2008
    “…The study also identifies highly risked construction stages, determines risk allocation for sources of risk, and proposes a computer program for the risk management. …”
    Get full text
    Get full text
    Thesis
  2. 2

    The adoption of software process improvement (SPI) program in the construction industry by Rasidi, Hanim, Ibrahim, Rahinah

    Published 2008
    “…Integrating the design process and automating the construction process are called for in the Industrialised Building System (IBS) Roadmap 2003-2010 and the Construction Industry Master Plan (CIMP) 2006-2015. …”
    Get full text
    Get full text
    Article
  3. 3

    Structural behaviour of steel fabric reinforced concrete wall panel under eccentric loading / Ruzitah Supinyeh by Supinyeh, Ruzitah

    Published 2009
    “…The analysis of the wall panel model yielded from the computer program PROKON of version 2.4 by using a 3-dimensional model of the wall panel. …”
    Get full text
    Get full text
    Thesis
  4. 4
  5. 5
  6. 6

    Analysis on wire mesh reinforced concrete wall with opening / Nazatulfizah Mohd Sharif by Mohd Sharif, Nazatulfizah

    Published 2008
    “…This research paper analyzes the wire mesh reinforced concrete wall panel with opening in a full-scale model by using a finite element computer program. The analysis of the wall panel model yielded from the computer program LUSAS of version 13.6 by using a 3-dimensional model of the wall panel. …”
    Get full text
    Get full text
    Thesis
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11

    Remedial program learning application / Nor Anis Sofia Mohd Hasazli by Mohd Hasazli, Nor Anis Sofia

    Published 2020
    “…The development of RPLA was constructed using Unity, Audacity and Adobe Photoshop. …”
    Get full text
    Get full text
    Thesis
  12. 12
  13. 13
  14. 14

    Employer’s expectation to QS graduates in facing Industrial Revolution 4.0 / Mohamad Zaifulzaki Kamde ... [et al.] by Kamde, Mohamad Zaifulzaki, Mamter, Shahela, Mamat, Mohd Esham, Abdullah@Dolah, Noor Anisah

    Published 2022
    “…Currently, the construction industry is facing a new phase of the industrial revolution where computers and robotics are implemented around the midst of the revolution thus bringing new technology that can give many benefits to the construction industry. …”
    Get full text
    Get full text
    Conference or Workshop Item
  15. 15
  16. 16
  17. 17

    Effectiveness of fuzzy approach in maximizing portfolio diversification benefit / Zulkifli Mohamed by Mohamed, Zulkifli

    Published 2011
    “…Linear programming optimization tool was used to construct the portfolios' efficient frontier. …”
    Get full text
    Get full text
    Thesis
  18. 18

    Graph coloring program of exam scheduling modeling based on bitwise coloring algorithm using python by Arifin, Samsul, Muktyas, Indra Bayu, Al Maki, Wikky Fawwaz, Mohd Khairul Bazli, Mohd Aziz

    Published 2022
    “…Graph coloring has a wide range of applications and is commonly used to solve scheduling issues. In this article, the researchers design an algorithm and apply it to a computer program (Python) to solve graph coloring and to visualize the variation of exam scheduling modeling at Binus University in graphs based on the Bitwise Graph Coloring Algorithm. …”
    Get full text
    Get full text
    Get full text
    Article
  19. 19
  20. 20

    A cluster-based hybrid replica control protocol for high availability in data grid by Mabni, Zulaile

    Published 2019
    “…In recent years, the number of distributed nodes has become very large in Grid computing system. The growing number of nodes has raised few issues in data replication. …”
    Get full text
    Get full text
    Thesis