Search Results - ((programmes OR (programmes OR (programmers OR (programd OR programd)))) OR programme) _ controlled

Refine Results
  1. 1

    The sustainability of communication for behavioural impact (COMBI) programme in the prevention and control of dengue in Kelantan by Abdullah Husam, A Shukor

    Published 2014
    “…COMB I programme is one of the approaches used by the Ministry of Health Malaysia (MOH) on dengue prevention and control. …”
    Get full text
    Get full text
    Thesis
  2. 2

    What Children Learn From Television Programmes: The Case of Serdang Area, Selangor by Omer, Mutaz Osman

    Published 1999
    “…However, the study showed that the parents are the major factor in controlling what programmes their children watch. The results indicated that the parents paid attention on which programmes and what the type of programmes their children can watch. …”
    Get full text
    Get full text
    Thesis
  3. 3

    Development and preliminary evaluation of a multi-component workplace wellness programme targeting overweight and obese workers / Nur Suffia Sulaiman by Nur Suffia, Sulaiman

    Published 2017
    “…Those in the programme were 1.6 times more likely to lose this amount compared to controls (RR = 1.6; 95% CI: 1.2, 2.2). …”
    Get full text
    Get full text
    Thesis
  4. 4

    Effects of implementing herd health programme on performance of goats in a smallholder farm by Shahudin, Muhammad Syafiq

    Published 2017
    “…After 5 months of feeding programme, the mean of final body weight in experimental group (28.8±0.87 kg) has shown a significant improvement compared with control group (25.6±0.81 kg). …”
    Get full text
    Get full text
    Get full text
    Thesis
  5. 5
  6. 6

    Integrating programmable logic controller (PLC) to detect metal and non metal part / Hazman Zaim Hussin. by Hussin, Hazman Zaim

    Published 2006
    “…A programmable controller or Programmable Logic Controller (PLC) is a device which is capable of being programmed to perform a controlling function. …”
    Get full text
    Get full text
    Thesis
  7. 7

    A review on the applications of programmable logic controllers (PLCs) by Alphonsus, Ephrem Ryan, Mohammad Omar, Abdullah

    Published 2016
    “…In this paper a review on the application of programmable logic controller (PLC) in our current market is discussed. …”
    Get full text
    Get full text
    Get full text
    Article
  8. 8

    Programmable notice board / Nabil Imran Khairuddin & Muhammad Khairul Hamizan Misbah by Khairuddin, Nabil Imran, Misbah, Muhammad Khairul

    Published 2015
    “…PIC microcontrollers (Programmable Interface Controllers), are electronic circuits that can be programmed to carry out a vast range of tasks. …”
    Get full text
    Get full text
    Student Project
  9. 9

    Alarm system using programmable interface controller (PIC) / Mohamad Fauzi Omar by Omar, Mohamad Fauzi

    Published 1999
    “…This project invoives the design and development of an alarm system using PIC - (Programmable Interface Controller) microcontroller. The system consists of a controlling unit (CU) using PIC16F84 with EPROM (M27C256), a sensor unit (SU) and display unit (DU). …”
    Get full text
    Get full text
    Thesis
  10. 10

    Automatic controlled and monitoring drainage system using CX-Programmer and Touchwin Xinje Designer by Muda, Ahmad Syazani

    Published 2020
    “…This writing present the Intelligent Automatic Drainage Monitoring and Control system which relies on Programmable Logic Controller (PLC). …”
    Get full text
    Get full text
    Student Project
  11. 11

    Automation: programmable controller / Azmi Abdul Hamid and Samsuddin Awang by Abdul Hamid, Azmi, Awang, Samsuddin

    Published 1986
    “…The development of microprocessor introduces Programmable Controller as a substitute for the electro-mechanical relay logic automation system. …”
    Get full text
    Get full text
    Student Project
  12. 12

    Evaluation of a community based hypertension self management education (HSME) programme in the state of Penang, Malaysia: a mixed-method study / Hanisah Mohd Yatim by Mohd Yatim, Hanisah

    Published 2017
    “…Low self-efficacy level among the patients could have been the underlying reason for poor daily selfmanagement of hypertension, leading to suboptimal BP control. A structured, groupbased hypertension self-management education (HSME) programme could be a potential solution to improve BP control; however, the impact and effective elements of HSME programme in the Malaysian setting remain unknown. …”
    Get full text
    Get full text
    Thesis
  13. 13

    Effect of a call recall system on uptake of cervical cancer screening among non compliant school teachers in Kuala Lumpur / Fauziah Abdullah by Abdullah, Fauziah

    Published 2013
    “…An intervention group received an organized call-recall programme, while the control group received an opportunistic programme; and followed for 24 weeks. …”
    Get full text
    Get full text
    Thesis
  14. 14

    Programmable logic controller polymer mixing tank / Mohd Hazwan Md Shah by Md Shah, Mohd Hazwan

    Published 2012
    “…The Omron programmable logic controller will control the inlet intake water sequence process and polymer for pump on how much the concentration needed to be mixed by measuring the level of water inside the tank. …”
    Get full text
    Get full text
    Thesis
  15. 15

    Development of traffic light control system using programmable logic controller by Ahmad, Azrulnor

    Published 2007
    “…Development of a traffic light control system using PLC (Programmable Logic Controller) is the title of this project. …”
    Get full text
    Get full text
    Undergraduates Project Papers
  16. 16

    Effectiveness of a structured weight management programme at workplace among employees of a petroleum industry in Malaysia by Roszanadia Rusali, Suzana Shahar, Lee, Xiao Wen, Zahara Abdul Manaf

    Published 2016
    “…In this quasi-experimental study, sixty-four of overweight and obese adults were recruited and divided into two groups (intervention group, n = 32 and control group, n = 32). Subjects in the intervention group received three months scheduled programme and the control group received a routine weight management consultation from dietitians. …”
    Get full text
    Get full text
    Get full text
    Article
  17. 17

    A nutrition programme using positive deviance approach to reduce undernutrition among urban poor children under-five in Malaysia: a cluster randomised controlled trial protocol by Chek, Lok Poh, Gan, Wan Ying, Chin, Yit Siew, Sulaiman, Norhasmah

    Published 2022
    “…Phase two will involve a two-armed cluster randomised controlled trial to evaluate the effectiveness of a programme developed based on the positive deviance approach. …”
    Get full text
    Get full text
    Article
  18. 18

    The effect of contemporary nursing care programme on Islamic work ethics and nursing caring behaviour in Southern Thailand by Pairoh, Hasanah

    Published 2021
    “…The experimental group received five sessions of Contemporary Nursing Care Programme and prior to that, both the experimental and control group received a pre-test while the post-test was conducted in the following week after completion of the programme. …”
    Get full text
    Get full text
    Thesis
  19. 19

    Effects of student leadership in a peer-to-peer programme on resiliency, self-efficacy and motivation of undergraduate students in a private university / Christine Wong Siew Kuan by Christine Wong , Siew Kuan

    Published 2020
    “…A quasi experiment was conducted where the student group who took the P2P programme was the treatment group while the student who did not join the P2P was the control group. …”
    Get full text
    Get full text
    Get full text
    Thesis
  20. 20

    Smart waste management for an eco environment at the housing area: article by Majidan, Muhammad Farhan

    Published 2020
    “…Then, the program being execute by Omron programmable controller. Then, TouchWin is interfaced with the Omron programmable controller via Universal Serial Bus (USB). …”
    Get full text
    Get full text
    Article