Search Results - (( time optimization based algorithm ) OR ( using active path algorithm ))
Search alternatives:
- time optimization »
- path algorithm »
- using active »
- active path »
-
1
Test case generation from state machine with OCL constraints using search-based techniques / Aneesa Ali Ali Saeed
Published 2017“…In order to generate optimal data to satisfy whole constraints in the feasible path, new method with SBTs is necessary to satisfy the whole constraints at the same time of the whole path executing. …”
Get full text
Get full text
Get full text
Thesis -
2
Solving vehicle routing problem by using improved genetic algorithm for optimal solution
Published 2023Article -
3
Hybrid genetic algorithm with multi-parents recombination for job shop scheduling problems / Ong Chung Sin
Published 2013“…Metaheuristic is one of the “approximation methods” that is able to find practically acceptable solutions especially for large-scale problems within a limited amount of time. Genetic Algorithms (GA) which is based on biological evolution is one of the metaheuristics that has been successfully applied to JSSP. …”
Get full text
Get full text
Get full text
Thesis -
4
A reliable time base routing framework with seamless networking operation for SDN / Nauman Khan
Published 2024“…PMTRF modules and their algorithms enable the isolation of the maintenance switch and the selection of the most reliable path for future affected flows based on input time provided by the administrator. …”
Get full text
Get full text
Get full text
Thesis -
5
Energy balancing mechanisms for decentralized routing protocols in wireless sensor networks
Published 2012“…It is based on Ant Colony Optimization (ACO) meta heuristic, which is adopted to enhance the paths with the best-quality function. …”
Get full text
Get full text
Thesis -
6
Mobile Crowd Steering Evacuation Model via Agent Based Simulation by Applying the Social Force Model
Published 2025“…Famous simulation models include agent-based crowd guiding. The evaluation states that the existing agent-based steering model computes the complete set of collision-free paths with the least travel time among agents to make path decisions based on updated information. …”
Get full text
Get full text
Get full text
Get full text
Thesis -
7
A Continuous Overlay Path Probing Algorithm For Overlay Networks
Published 2013“…The primary idea is to perform active measurements using the applications’ packets instead of using extra probe packets. …”
Get full text
Get full text
Thesis -
8
-
9
Embedded Dual Band Rfid Based Blood Glucose Monitoring System For Internet Of Medical Things
Published 2020“…These two parameters are then taken into account in experimental setup for performance evaluation of the enhanced CSMA/CA (EN-CSMA/CA) algorithm that uses an external interrupt mechanism and a cross layer approach. …”
Get full text
Get full text
Thesis -
10
Nonlinear FXLMS algorithm for active noise control systems with saturation nonlinearity
Published 2012“…In active noise control (ANC) applications, the saturation effect of the loudspeaker in the secondary path is considered as the most serious problem that could degrade performance of standard filtered-x least mean square (FXLMS) control algorithm. …”
Get full text
Get full text
Get full text
Article -
11
An improved algorithm in test case generation from UML activity diagram using activity path
Published 2011Get full text
Get full text
Get full text
Conference or Workshop Item -
12
Path Planning and Control of Mobile Robot in Road Environments using Sensor Fusion and Active Force Control
Published 2018“…The sensor fusion algorithm is used to remove noises and uncertainties from sensors' data and provide optimum measurements for path planning. …”
Get full text
Get full text
Get full text
Article -
13
Nonlinear adaptive algorithm for active noise control with loudspeaker nonlinearity
Published 2014“…The proposed THF-NLFXLMS algorithm models the Wiener secondary path and applies the estimated degree of nonlinearity of the nonlinear secondary path in the control algorithm design. …”
Get full text
Get full text
Thesis -
14
All-pass filtered x least mean square algorithm for narrowband active noise control
Published 2018“…Most available ANC uses the secondary path modelling including filtered x least mean square (FxLMS) algorithm. …”
Get full text
Get full text
Get full text
Get full text
Article -
15
An application of Floyd-Warshall Algortihm in finding shortest path of order picker in warehouse / Saidatul Aisyah Roslan, Siti Norhakimah Mohd Yatim and Siti Sarah Sulaiman
Published 2019“…For the result, shortest path for the order pickers in iterations. The algorithm used can help the order picker to have the shortest path, but it have no direct path. …”
Get full text
Get full text
Student Project -
16
Sizing optimization of large-scale grid connected photovoltaic system using dolphin echolocation algorithm / Muhammad Zakyizzuddin Rosselan
Published 2018“…Later, an Iterative-based Sizing Algorithm (ISA) was developed to determine the optimal sizing solution which was later used as benchmark for sizing algorithms using optimization methods. …”
Get full text
Get full text
Thesis -
17
-
18
Biogeography based optimization (BBO) algorithm to minimise non-productive time during hole-making process
Published 2015“…The aim of this study is to minimise the non-productive time, including tool travelling time and tool switching time, by employing biogeography based optimization algorithm, since the problem is considered as NP-hard. …”
Get full text
Get full text
Get full text
Article -
19
Integrated optimal control and parameter estimation algorithms for discrete-time nonlinear stochastic dynamical systems
Published 2011“…This thesis describes the development of an efficient algorithm for solving nonlinear stochastic optimal control problems in discrete-time based on the principle of model-reality differences. …”
Get full text
Get full text
Thesis -
20
Optimum Time-Cost Trade-Off Strategies on Critical Path Method for Project Management
Published 2010“…When critical activity is stretched and the shortest possible of project completion is extended, other paths may also become noncritical, therefore, the noncritical activities can be stretched again until all the slack in the different noncritical paths is used up. …”
Get full text
Get full text
Thesis
